![ECO POWER DIYSolar OFF-GRID Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/eco-power/diysolar-off-grid/diysolar-off-grid_installation-manual_534198007.webp)
5
INSTALLATION
BATTERY BOX ASSEMBLY
Place P3 battery box enclosure
on top of T1 pole section, sliding
P3b tenon into place and
aligning the threaded holes.
Fasten tenon using six (6)
3/8-16 UNC-2B x 3/4” SS bolts,
tightened securely.
Feed fixture connecting wires
through the hole in the bottom
of the P3a battery box.
Using the same steps from the
pole assembly instructions, attach
section T1 to the top of the pole
assembly.
STEP
1
STEP
2
STEP
3
Remove the front access door
from the battery box (P3a), setting
it and fasteners aside and secure
for re-installation.