
Figure 3 Pipework Connections
7. Hydraulic
Connections
7.1
First Fixing Pipe-work
All the pipe-work and wiring connections enter at the bottom of the unit. To ensure a tidy
installation it is important to consider at the first fixing stage the order you arrange the pipe-work
and if applicable any cable trunking. Figure 3 shows the order in which to fix the pipe-work.
7.2
Connections
1. Gas
2. Heating Return
3. Heating Flow
4. Flow Domestic Hot Water
5. Cold Mains Water
6. Flow to Hot Water Cylinder
7. Return from Hot Water Cylinder
EC 25 Compact Technical Manual page
15