Check after installation and test operation
Check after installation
Items to be checked
Has it been fixed firmly?
Have you done the refrigerant leakage test?
Is heat insulation sufficient?
Is water drainage well?
Is the voltage in accordance with the rated
voltage marked on the nameplate?
Is the electric wiring and piping
connection installed correctly and securely?
Has the unit been connected to a secure
earth connection?
Is the power cord specified?
Is the inlet and outlet been covered?
Is ventilation sufficient?
Has the length of connection pipes
and refrigerant capacity been recorded?
Possible malfunction
The unit may drop, shake or emit noise.
It may cause insufficient cooling(heating)
capacity
It may cause condensation and dripping.
It may cause condensation and dripping.
It may cause electric
malfunction or damage the part.
It may cause electric
malfunction or damage the part.
It may cause electrical leakage.
It may cause electric malfunction or
damage parts in the unit.
It may cause insufficient cooling(heating)
capacity.
The refrigerant capacity is not accurate.
Test Operation
1.
Before test operation
(1)
Do not switch on power before installation is finished completely.
(2)
Electric wiring must be connected correctly and securely.
(3)
Cut-off valves of the connection pipes should be opened.
(4)
All the impurities such as scraps and debris must be cleared from the unit.
2.
Test operation method
(1)
Switch on power, press "ON/OFF" button on the wireless remote control to start
the operation.
(2)
Press MODE button, to select the COOL, HEAT,
FAN to check whether the
operation is normal or not.
23