Eclipse Tube Firing

Burners

Models TFB030, TFB075, TFB200

Version 2

TFB030-075

TFB200

11/14/2014

Design Guide 310

Содержание TFB030

Страница 1: ...Eclipse Tube Firing Burners Models TFB030 TFB075 TFB200 Version 2 TFB030 075 TFB200 11 14 2014 Design Guide 310...

Страница 2: ...and Eclipse will not be liable for any other injury loss damage or expenses whether direct or consequential including but not limited to loss of use income or damage to material arising in connection...

Страница 3: ...ment Parts 5 3 System Design 6 Design 6 Step 1 Burner Selection 6 Step 2 Control Methodology 10 Step 3 Ignition System 11 Step 4 Flame Monitoring Control System 11 Step 5 Combustion Air System Blower...

Страница 4: ...commended recuperators for the TFB are the Eclipse Bayonet Data 317 and the Bayonet Ultra Spec 318 Figure 1 1 TFB Burner Audience This manual has been written for people who are already familiar with...

Страница 5: ...by sanding sawing grinding cutting and other construction activities could release crystalline silica Crystalline silica is known to cause cancer and health risks from the exposure to these chemicals...

Страница 6: ...et TFB030 310 2 Datasheet TFB075 310 3 Datasheet TFB200 Fuel Type The usable fuel types are Natural Gas Propane Butane For other fuels contact Eclipse with an accurate breakdown of the fuel contents A...

Страница 7: ...rner Input Calculate the gross burner input BTU hr with this formula Gross Burner Input Required Heat Release Efficiency Compare the Gross Burner Input Compare the gross burner input with the maximum...

Страница 8: ...he net heat release to the tank is derived from heat balance calculations These calculations are based on the heat up and steady state requirements of the process and take into account surface losses...

Страница 9: ...7 x 12 444 8 625 x 3 142 x 44 12 032 3 sq in BTU hr sq in Net heat release to tank sq in surface area 1 000 000 12 032 3 83 1 BTU sq in hr NOTE If the medium to be heated in the above example was cook...

Страница 10: ...choose depends on the type of process that you want to control Control Methods There are two main methods to control the input of a TFB system 1 Modulating control A burner system with modulating cont...

Страница 11: ...n the time limit Under these circumstances you must consider the following options start at higher input levels resize and or relocate the gas controls Step 4 Flame Monitoring Control System A flame m...

Страница 12: ...ower data is based on the International Standard Atmosphere ISA at Mean Sea Level MSL which means that it is valid for sea level 29 92 Hg 70 F If you are above sea level or in a hot area the propertie...

Страница 13: ...25 The total selection information you should now have blower model number motor hp motor enclosure TEFC voltage number of phases frequency rotation direction CW or CCW Air Pressure Switch The air pre...

Страница 14: ...er mm inch in 3 94 x 10 2 MJ Nm Btu ft standard 26 86 From To Multiply By kiloPascals kPa millibar mbar 10 meter m millimeter mm 1000 millibar mbar kiloPascals kPa 0 1 millimeter mm meter m 0 001 From...

Страница 15: ...ine is connected between the top of the ratio regulator and the burner body 742 Main Gas Shut Off Valve Train Eclipse strongly endorses NFPA as a minimum 790 791 Pilot Gas Valve Train Eclipse strongly...

Страница 16: ...A manual reset version requires pushing a button to transfer the contacts when the pressure set point is satisfied 840 Pressure Gauge A device to indicate pressure 940 Check Valve A check valve permi...

Страница 17: ...Notes ii...

Страница 18: ...Design Guide 310 11 14 2014 Eclipse Inc All Rights Reserved...