5.1.1.1 Mounting on the DIN rail
Step 1:
The two retaining springs on the underside of the device are to be pulled out using a flat-bladed screw
driver until they click into place.
In order to carry out the assembly/disassembly there must be a distance of at least 8 mm between
the bottom of the case controller and the next component (e.g. cable channel), otherwise the re
taining springs cannot be pulled out.
Step 2:
Place the case controller on the top edge of the DIN rail and tilt it downwards until the case controller is
positioned on the lower edge of the DIN rail.
Step 3:
Press the two retaining springs until they click into place and check
that the case controller is firmly attached to the DIN rail.
The controller can be taken into use after completing mechanical and electrical installation.
Electrical enclosure and dimensions are listed in Section Specifications.
Содержание UA 410 L Case Controller
Страница 30: ...Function of UA 410 L 24 Firmware V1 50 Doku 2 0 06 April 2016 Notice...
Страница 52: ...Installation and Startup of UA 410 L 46 Firmware V1 50 Doku 2 0 06 April 2016 Notice...
Страница 72: ...Operation of UA 410 L 66 Firmware V1 50 Doku 2 0 06 April 2016 Notice...
Страница 80: ...Menu Structure of UA 410 L 74 Firmware V1 50 Doku 2 0 06 April 2016 Notice...
Страница 82: ...Decommissioning and disposal 76 Firmware V1 50 Doku 2 0 06 April 2016 Notice...
Страница 92: ...Order numbers and accessories of UA 410 L 86 Firmware V1 50 Doku 2 0 06 April 2016 Notice...