XDM-300 Installation and
Maintenance Manual
Equipment
Installation
417006-2311-0H3-A00 ECI
Telecom
Ltd.
Proprietary
3-17
C
AUTION
:
If additional equipment other than XDM-300
shelves is used in the rack, a heat buffer must be installed
between any such additional equipment and the XDM-300
shelf to minimize the transfer of heat from shelf to shelf.
Consult your ECI Telecom representative regarding the exact
heat buffer required.
Installing the xRAP-B
Before connecting DC power cables, refer to DC Power Cables (on page
The installation of an xRAP-B unit includes the following steps:
1.
Prepare DC power cables.
2.
Install the xRAP-B in the prescribed location, either at the top of the rack or
on the extendable installation rails.
3.
Ground the xRAP-B to the rack grounding stud.
4.
Connect DC input power cables to the xRAP-B.
5.
Connect the DC power cables of the XDM-300 shelves to the xRAP-B.
6.
Install circuit breakers.
7.
Check DC voltage polarity.
8.
Connect the alarm cables.
For a description of the xRAP-B, refer to the XDM-300 Reference Manual.
The DC input power cables connect between the two DC power sources and the
xRAP-B source A and source B inputs. Two cables are required, one for each
source.
N
OTE
:
According to accepted industry standards for
connecting DC power, the positive lead (+48 V) should be
connected with a red cable, and the negative lead (-48 V) with
a black cable. However, according to the BS7671 (GB) and
HD 308 S2:2001 (EU) standards, the positive lead (+48 V)
should be connected with a blue cable, and the negative lead
(-48 V) with a gray cable. In the following sections that
describe DC power cable connections, use cables with
appropriate colors to comply with the standards in your area
of residence.
Содержание XDM-300
Страница 1: ...XDM 300 Installation and Maintenance Manual Version 7 417006 2311 0H3 A00...
Страница 2: ......
Страница 8: ......
Страница 24: ...Introduction XDM 300 Installation and Maintenance Manual 1 8 ECI Telecom Ltd Proprietary 417006 2311 0H3 A00...