![Echo SMR-2410 TYPE 1E - 02-99 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/echo/smr-2410-type-1e-02-99/smr-2410-type-1e-02-99_operators-manual_4002890017.webp)
G
RASS
T
RIMMER
/B
RUSH
C
UTTER
O
PERATOR
'
S
M
ANUAL
17
8. Position lower U-Handle bracket (K) 400mm (15-3/4 in.) fromengine
end of drive shaft. Secure with three (3) 5mm x 30mm bolts.
9. Position harness hook 220mm (8-5/8 in.) from engine end of drive
shaft assembly. DO NOT tighten at this time.
10. Install upper U-Handle and bracket on lower bracket and secure with
one (1) 8mm x 55mm bolt (L) and large circular washer.
11. Install power head and align gear box, power head and U-Handles.
Tighten all screws.
12. Route throttle linkage and ignition lead assembly around front of U-
Handle bracket and clip to drive shaft as shown.
13. Place throttle linkage (D) through adjustment fixture (E) and install
wire end into large carburetor throttle swivel hole (C). Check throttle
for freedom of movement and that wide open throttle / low idle
extremes are adjusted properly. The throttle linkage must be
adjusted by moving the adjustment fixture (E). Consult with your
Echo Dealer for correct adjustment procedure.
SRM-2400
14A. Connect jumper lead (M) spade terminal end to power head
ignition lead (A). Install black wire holder (N) and ground lead (O)
on clutch case with bolt (B). Connect female (M) and male (O)
ignition leads to male and female lead from throttle linkage.
400 mm (15-3/4 in.)
220 mm (8-21/32 in.)
ENGINE
END
K
C
E
D
A
O
B
N
M
L