20
BLADE
REPLACEMENT
/
LUBRICATION
Level 1.
Tools Required: Scrench, Locking Tool, Needle Nose Pliers, 8 mm
Open End Wrench
Parts Required: ECHO
®
LUBE
TM
8 oz. (P/N 91014) or Lithium Base
Grease, Blade P/N 69601552632
NOTE
Grease gear case every 15 - 25 hours of use. Replace blade when it
is worn shorter than 6 in. Remove blade and holders before
greasing to prevent damage to gear and bearings.
1.
Shut engine off.
2.
Remove split pin (A).
3.
Rotate blade until holes in inner blade adapter (B) and gear box
align. Insert locking tool to lock PTO shaft (C).
NOTE
Shield cover not shown for illustration clarity.
NOTE
Blade nut (D) is left hand thread.
4.
Remove blade nut (D) in a clockwise direction using scrench.
Remove outer blade adapter (E), blade (F) and inner blade adapter
(B).
5.
Remove plug (G) and grease gear housing. Do not over fill - grease
will emerge between PTO shaft (C) and seal when over full.
6.
Install inner blade adapter (B) onto PTO shaft (C).
7.
Install and center new blade (F) onto inner adapter (B).
8.
Install outer adapter (E) and nut (D). Tighten nut (D) firmly,
counterclockwise (CCW).
IMPORTANT
Never reuse old split pin.
9.
Install new split pin (A) (#89850201130) to secure nut.
Содержание PE-200
Страница 23: ...POWER EDGER OPERATOR S MANUAL 23 NOTES...