6
5 INCH CHIPPER/SHREDDER/BLOWER
Section
2
ASSEMBLY
1. Hold one wheel to a hub and align the wheel lug holes
with the hub lug studs.
2. Thread the lug nuts on the hub studs and tighten to
75 ft-lbs. Follow a star pattern when tightening lug
nuts.
3. Repeat for the remaining wheel.
2.1 ATTACH TRAILER WHEELS
1.
First, attach the hitch pole assembly (10) to the hitch
channel in the trailer deck bottom with two 3/8 x 3 1/4"
bolts (1), washers (2) and nylock nuts (3) and one
3/8 x 3" bolt (4), washer (2) and nylock nut (3). (See
Figure 2.1)
Figure 2.1, Trailer Hitch Assembly
(Non-CE Compliant Model Shown)
1
2
2
3
3
4
5
6
7
8
9
10
If any bolts or nuts are dropped in the machine, be
sure to remove them before starting the machine.
WARNING
2.2 ATTACH HITCH ASSEMBLY
Figure 2.3, Wire Harness Routing
(CE Compliant Model Shown)
8
8
8
Three coated clamps (8) will be used for wiring harness
mounting and routing purposes. Place wiring harness
in clamps before securing the clamps in place on the
bolts. See Figures 2.1 and 2.3 for clamp locations and
mounting details.
NOTE
Figure 2.2, Hitch Attachment Locations
2.
Next, place the two hitch plates (5) over the axle and
attach to hitch pole using two 1/2 x 3 1/4" bolts (6),
two washers (7) and two nylock nuts (9) as shown in
Figures 2.1 and 2.2.