
Cutting Station Enclosure - Assembly Instructions
1. Connect
RED
to
GREEN
– the
RED
middle vertical tube is offset from the centre;
ensure the smaller gap is away from
GREEN
2. Connect
BLUE
to
GREEN
– ensure the smaller gap is away from
GREEN
.
3. Attach
GREY
roof brace.
4. Attach
YELLOW
roof brace.
5.
Insert the wheels along one side, then the remaining side.
Note: The frames are not actually coloured.
Tel: 0208 408 7107 [email protected] www.echobarrier.co.uk
Stage 1 - Frame