background image

 
 
 
 

 

WH-SPHA3.6H-5.12kWh     WH-SPHA3.6H-10.24kWh 

WH-SPHA4.6H-5.12kWh     WH-SPHA4.6H-10.24kWh 

  WH-SPHA5.0H-5.12kWh      WH-SPHA5.0H-10.24kWh 

  WH-SPHA6.0H-5.12kWh      WH-SPHA6.0H-10.24kWh 

 

  

USER MANUAL

Содержание WH-SPHA3.6H-5.12kWh

Страница 1: ...WH SPHA3 6H 5 12kWh WH SPHA3 6H 10 24kWh WH SPHA4 6H 5 12kWh WH SPHA4 6H 10 24kWh WH SPHA5 0H 5 12kWh WH SPHA5 0H 10 24kWh WH SPHA6 0H 5 12kWh WH SPHA6 0H 10 24kWh USER MANUAL...

Страница 2: ...stricted Locations 13 2 1 3 Barrier to Habitable Rooms 13 2 1 4 SELECT MOUNTING LOCATION 15 2 2 Installation Steps 16 2 2 1Battery Box Installation 16 2 2 2 Inverter Box Installation 21 2 3 Cable Conn...

Страница 3: ...ON WIFI RELOAD 41 4 1 Preparation 41 4 2 Wi Fi Reset Reload 42 4 3 Install Side Plate 43 5 EMS CONFIGURATIONS 44 6 ECOS Hub PC User Manual For Agent 45 7 Cleaning and Maintenance 54 7 1 Cleaning 54 7...

Страница 4: ...erred to as WIFO PRO with all rights reserved Please keep the manual properly and operate in strict accordance with all safety and operating instructions in this manual Please do not operate the syste...

Страница 5: ...DC power generated by the PV array into the battery or convert it into AC power to loads This user manual applies to the following products WH SPHA3 6H 5 12kWh WH SPHA3 6H 10 24kWh WH SPHA4 6H 5 12kWh...

Страница 6: ...e warranty commitment for the BESS will be invalid Appropriate methods must be adopted to protect BESS from static damage Any damage caused by static is not warranted by WIFO PRO The neutral continuit...

Страница 7: ...pper and lower connection plate 1x Meter Three Phase Meter Single Phase Meter 1xQuick Installation Manual Label accessory 8xM4 10 1xM4 10 PE 1x Back plate 4xCushions 10xCable ties 2x 10 60 Disassemble...

Страница 8: ...per and lower connection board 1x Meter Three Phase Meter Single Phase Meter 1xQuick Installation Label accessory 16xM4 10 1xM4 10 PE 2x Back plate 4xCushions 15xCable ties 4x 10 60 Disassemble tool 1...

Страница 9: ...e LED blinking with an interval of 1sec Checking Blue LED blinking with an interval of 0 5sec Normal Blue LED on DSP fault Red LED on Battery com fault Red LED blinking with an interval of 1sec Meter...

Страница 10: ...10 Terminals of BESS...

Страница 11: ...lat head screwdriver F PV connection area Plug and play terminals no tool required G Earthing screw Cross screwdriver 2 5 N m H PV switch optional For Australia and New Zealand the PV switch is not in...

Страница 12: ...to shipping or insurance company in this case as soon as the container packaging is unloaded and such damage is identified Failure to follow any all of the user manual the installation guide and the m...

Страница 13: ...liance 2 within 600 mm of any exit 3 within 600 mm of any window or ventilation opening 4 within 900 mm of access to 220 230 240 Vac connections 5 within 600 mm of side of other device BESS installed...

Страница 14: ...14 500 1 500 mm beside the BESS 2 800 mm above the BESS 3 500 mm before the BESS...

Страница 15: ...le 1 The BESS should be installed on a solid surface where is suitable for inverter s dimensions and weight Rule 2 The BESS installation should stand vertically or lie on a slop by max 2 Pic 1 Rule 3...

Страница 16: ...or convenient maintenance Rule 6 Product label on The BESS should be clearly visible after installation 2 2 Installation Steps Unpacking the battery box and inverter box Unpacking the battery box Unpa...

Страница 17: ...on back plate from the inverter attachment package and pre tighten the back plate to the top of the battery box with two M4 10 screws as shown in the figure below Step 3 Drilling holes Put the pre ins...

Страница 18: ...cking back plate with self tapping screws note that the battery box is fixed with the back plate Replace the battery box and align the expansion pipe with the backboard hole and then spin the self tap...

Страница 19: ...be careful not to hit the Back plate Step 8 drilling holes Put the pre installed battery box in a specified position so that it is close to the fixture mark it according to the hole position on the b...

Страница 20: ...ion pipe into the locking back plate with self tapping screws note that the battery box is fixed with the back plate Replace the battery box and align the expansion pipe with the backboard hole and th...

Страница 21: ...er and lower connection plate Torque 2 5N m 2 2 2 Inverter Box Installation Step 1 Take the inverter out of the box and place it smoothly on the battery box Be careful not to damage the cables of the...

Страница 22: ...ainless steel screws then lock the battery box and inverter with a upper and lower connection plate and finally lock the back plate with the screws of the inverter Torque 2 5N m Step 3 Install Wifi mo...

Страница 23: ...e requirement of an additional external break switching device that conforms to the requirements AS NZS 4777 1 2 3 2 Connect the Inverter Box and Battery Box Recommended cables and terminals Cable Typ...

Страница 24: ...all the switches and breakers on the BESS are turned off Step 1 Untie the cable ties Step 2 First open the waterproof cover of the corresponding terminal and insert the corresponding terminal in turn...

Страница 25: ...ct the communication cables Open the communication cover plate and wiring according to the print instructions on the communication cover board Open the press nut of the waterproof connector pull out t...

Страница 26: ...t according to the type description on the box Open the press nut of the waterproof joint and pull out the seal race Then penetrate the wire into the hole Note The length of the cable shall be less th...

Страница 27: ...27 2 Put the I terminal into the cable and press it tightly with pressure line clamps 3 Insert the terminal into the wiring seat use a cross screwdriver to lock the screws 2 5N m and tighten the nut...

Страница 28: ...han 10 ms so do not connect loads that depend on a stable energy supply for a reliable operation Loads which may create very high start up current surges such as fixed frequency air conditioner high p...

Страница 29: ...29 2 Plug through the terminal and lock the nut 3 Finish the interpolation Grade Description Value A Outside Diameter 5 5 8 0mm B Conduct Wire Length 7mm C Conduct Core Section 4 6mm 2...

Страница 30: ...30 2 3 3 System Wiring Please select breaker according to the specification below Three Phase Meter Single Phase Meter...

Страница 31: ...function will not work Model WH SPHA3 6H 5 12kWh 10 24kWh 50A 230V AC breaker 32A 230V AC breaker Depends on household loads usually already placed in the grid distribution box WH SPHA4 6H 5 12kWh 10...

Страница 32: ...rence and feed in power CT meter ratio and accuracy table Manufacturer Model CT ratio Accuracy Acrel Co Ltd ACR10R D16TE 3000 0 5 level 2 3 5 External isolation devices for PV array For Australia and...

Страница 33: ...response modes Demond response mode Requirement DRM0 Disconnected Import power 0 Generate power 0 DRM1 Import power 0 DRM2 Import power 50 DRM3 Import power 75 DRM4 Import power Not limited DRM5 Gene...

Страница 34: ...int instructions on the communication cover board Open the press nut of the waterproof connector pull out the seal race then penetrate the conductor into the hole connect the corresponding label in tu...

Страница 35: ...35...

Страница 36: ...switch on every battery module Note The battery switch isolates the internal battery modules which are connected in series the battery switch should not be used to disconnect the batteries under load...

Страница 37: ...Australia and New Zealand the PV SWITCH is not integrated Note The external isolation devices for PV array ports shall include the requirement of an additional external break switching device that co...

Страница 38: ...5 If backup load is applied switch on the backup breaker Step 6 Close the battery breaker cover Step 7 Configure the WIFI stick Only if this is the first time turning on the system Please follow the...

Страница 39: ...not open the upper cover plate of the BESS by yourself 3 3 2 First Aid Measures If battery module leaks electrolyte avoid contacting with the leaking liquid or gas If one is exposed to the leaked subs...

Страница 40: ...subjected to high temperature 150 When damaged or abused e g mechanical damage or electrical overcharge Burning cells can ignite other batteries in close proximity Explosion data Extreme mechanical a...

Страница 41: ...id or iOS smart phone STEP1 1 Scan the QR code on the front of the device to install Android or iOS version eCactus App which depends on the operating system STEP2 1 Open ECOS APP and click the sign u...

Страница 42: ...k then to solid status Which means Wi Fi is connected to eCactus successfully 4 2 Wi Fi Reset Reload Wi Fi Reset means restarting Wi Fi module Wi Fi settings will be reprocessed and saved Wi Fi Reload...

Страница 43: ...43 4 3 Install Side Plate Confirm that the left and right side plates are installed respectively after the BESS is working properly...

Страница 44: ...r family power to reduce buying power from power grid 2 Load Shifting Power from battery will be charge and discharged as you configured 3 Backup eCactus will not discharge battery unless power grid i...

Страница 45: ...king the tab to see more information about the device 3 Under operation the left bottom contains 4 commands to control the device which are Start Shutdown Reboot Upgrade Upgrade function allows you to...

Страница 46: ...46 Device info The device info module shows the device information inverter information meter information eps parameter and battery data Device information Inverter information Meter information...

Страница 47: ...parameter Battery data Curves This module shows the data curves of the device and supports query by date and export functions Single curve You can select no more than 6 data types to form into a singl...

Страница 48: ...48 Group curves This page shows the 28 different data curves of the device...

Страница 49: ...49 Configuration Battery setting...

Страница 50: ...ery first rather than grid power The battery capacity will not lower than setting percentage Under Loading shifting mode user can customize the charging and discharging based on time Under backup mode...

Страница 51: ...51 Safety Parameters The user can change device safety parameters on this page Active limit Reactive limit The user can change active and reactive limit settings on these pages...

Страница 52: ...he user can change some settings on this page Energy setting The agent only can check the energy settings of the device on this page Firmware Upgrade Agent can help user upgrade their device firmware...

Страница 53: ...53 Event This page shows the events warnings and faults for all devices under the account It also supports querying events on any date and exporting the queried data...

Страница 54: ...1C current Please refer to the table below for details Maintenance cycle at different temperatures Temperature Charging interval Months 25 18 35 12 45 6 CAUTION Servicing of batteries should be perfor...

Страница 55: ...grounded supply circuit 8 ANNEX 8 1 Datasheet All In One Spec Series name Agave Model WH SPHA3 6H 5 12kWh WH SPHA3 6H 10 24kWh WH SPHA4 6H 5 12kWh WH SPHA4 6H 10 24kWh WH SPHA5 0H 5 12kWh WH SPHA5 0H...

Страница 56: ...Input Output Rated output Power W 3600 4600 5000 6000 Rated Apparent Power to Grid VA 3600 4600 5000 6000 Max Apparent Power to Grid VA 3600 4600 5000 6000 Max Apparent Power from Grid VA 7200 9200 10...

Страница 57: ...ection Yes DC isolation protection Yes DC injection monitoring Yes Residual current detection Yes Anti islanding protection Yes Over load protection Yes Battery Input reverse polarity protection Yes P...

Страница 58: ...Noise Emission dB 25 Standby Power Consumption W 5 Safety and Approvals Safety IEC62040 1 2019 AS NZS 4777 2 2020 IEC 62109 1 2 IEC62619 UN38 3 IEC60730 1 EMC EN IEC 61000 6 2 2019 EN IEC 61000 6 3 2...

Страница 59: ...59 9 2 Battery label...

Страница 60: ...60...