background image

 

 

Quick Guide - SBU IO-Link 
 

 

 

 
Page 8 of 10 

 

                 

B04 

Commissioning 

 

 

Once the SBU IO-Link  has been connected to the controller on the user side in accordance with section B03, no 
further actions are necessary. The operating states of the SBU IO-Link  can be determined and parametrised with the 
aid of the EBRO Connect App.  

 

 

Make sure that the SBU IO-Link  is firmly mounted as intended on the quarter turn actuator and is electrically 
connected. 

 

Switch the SBU IO-Link  on only when the switch box is closed. 

 

The input and output states are additionally signalled by LEDs on the PCB. 

 

Two  light  elements  on  the  housing  cover  serve  as  visual  feedback  of  the  valve's  position  status 
(CLOSED/OPEN) 

B05 

Errors in general 

 

 

If the SBU IO-Link  does not work after connecting the power supply, make sure that the power supply is taken 
through to the terminal point and has been connected properly. If the red LED lights up, the power supply polarity is 
reversed. Correct polarity of the power supply is signalled by the green LED. 

 

 

B06 

Collective error 

 

 

Errors are signalled by the flashing of the red Error LED and the switching of the Collective Error output X1.6.  
No error messages have any effect on the current program sequence.  
The error is reset once the cause of the error has been rectified. 

B07 

Errors 

– Cause – Remedial action  

Errors that can be signalled by the SBU IO-Link  are: 

 

Error 

Cause 

Remedial action 

Collective  
error 

Runtime monitoring: 
 
The set running time is exceeded. 
 
 
 
 
 
 

Default value: 0 s (deactivated) 

Check the following components: 

Valve switched 

Actuator function 

Check compressed air supply 
Check the position of the cam plate. 
Check for jamming in the pipeline. 
The fault is automatically reset as soon 
as the repeated ride is within the time 
tolerance. 

Max. switching cycles: 
 
Max. set switching cycles reached. 
 

Default value: 0 n (deactivated)

 

Check the number of switching cycles 
performed. 
Reset or increase the counter. 

 

Содержание SBU IO-Link

Страница 1: ...ns not all possible type variants are shown Quick Guide in accordance with the EU RED Directive 2014 53 EU in accordance with the EC Machinery Directive 2006 42 EC English language version Revision 00...

Страница 2: ...5 B02 MOUNTING THE SBU IO LINK ON THE QUARTER TURN ACTUATOR 5 B03 ELECTRICAL CONNECTION 6 B04 COMMISSIONING 6 B05 ERRORS IN GENERAL 8 B07 ERRORS CAUSE REMEDIAL ACTION 8 D STORAGE PACKAGING AND TRANSP...

Страница 3: ...ly instructions can be downloaded from our website www ebro armaturen com These original assembly instructions as well as all other information necessary for safe use must be available to all persons...

Страница 4: ...ers The SBU IO Link is suitable only for the non explosive zone and may be operated only with a 24 V DC power supply The SBU IO Link is used only in an area that is not potentially explosive The SBU I...

Страница 5: ...are required for all other interfaces The SBU IO Link may only be operated with the accessories foreseen and approved by EBRO ARMATUREN Gebr Br er GmbH The SBU IO Link should be mounted as follows Un...

Страница 6: ...The associated circuit diagram is affixed inside the inner housing cover Connect the SBU IO Link in accordance with the permissible voltage All electrical connections to the user side controller are t...

Страница 7: ...ly to the respective terminal see wiring diagram J8 Control SV1 Set Not set Control via IO Link external Control via IO Link Control by external signal J9 Control SV2 Set Not set Control via IO Link e...

Страница 8: ...connected properly If the red LED lights up the power supply polarity is reversed Correct polarity of the power supply is signalled by the green LED B06 Collective error Errors are signalled by the f...

Страница 9: ...BU IO Link should be protected against static discharge D02 Packaging The complete SBU IO Link from EBRO ARMATUREN Gebr Br er GmbH is packed safely and fit for purpose in accordance with the transport...

Страница 10: ...Quick Guide SBU IO Link Page 10 of 10...

Отзывы: