background image

 

 

Quick Guide - SBU IO-Link 
 

 

 

 
Page 5 of 10 

 

                 

B) 

Mounting and commissioning   

 

 

Observe the safety information in the original assembly instructions regarding foreseeable risks in 
the mounting / connection / dismounting of the SBU IO-Link  in a control system. 
 

It is the responsibility of the user to supplement this information to cover other, especially local risks. 
Compliance with all requirements for this system is a prerequisite

 

B01 

General safety information 

Please read the safety information in the original assembly instructions carefully when handling the SBU IO-Link . It is 
the responsibility of the operating company to supplement this information to cover other, specifically local or process-
related risks. 
Please contact EBRO ARMATUREN Gebr. Bröer GmbH in case of questions or problems. 
The SBU IO-Link  conforms to the state of the art at the time of delivery and is deemed to be an incomplete machine 
within the meaning of the Machinery Directive.  

B02 Mounting the SBU IO-Link  on the quarter turn actuator 

The SBU IO-Link  is suitable for direct mounting on quarter turn actuators with the mounting interface according to 
VDI/VDE 3845 AA2 80 mm x 30 mm, shaft height 30 mm (max. dia. 30 mm). 
Adapters are required for all other interfaces. The SBU IO-Link  may only be operated with the accessories foreseen 
and approved by EBRO ARMATUREN Gebr. Bröer GmbH. 

 

 

The SBU IO-Link  should be mounted as follows: 

 

Unpack the SBU IO-Link  from the factory packaging at the installation 

location. 

 

Check the SBU IO-Link  for transport damage. 

 

Check the SBU IO-Link  for damage. 

 

In case of outdoor installation of SBU IO-Link  units, measures may need 

to be taken to ensure operation as intended. These include the 
"Diaphragm element" option for switch box ventilation or rain roofs and 
possibly enclosures of an adequate protection class. 

 

Determine the mounting position of the device (parallel to the actuator). 

 

Open the switch box cover.  

 

Align the drive shafts (groove) and switch box shaft (tongue). 

 

Check the flush fitting of the insert seals on the underside of the switch 

box housing. 

 

Push the switch box onto the drive shaft. 

 

Fasten the switch box to the actuator with 4 cheesehead screws and 

spring washers. 

 

Close the switch box cover again if the electrical connection is not to be 

made immediately. 

 

 
 
 Risk of injury in case of improper mounting. 

 
Mounting may only be carried out but authorised technical personnel using 
suitable tools! 
 

Risk of injury due to inadvertently switching on the plant and uncontrolled 
restarting. 

Secure the plant against inadvertent actuation. 
Ensure controlled restarting after mounting. 
                                                                                                                          

 

DANGER 

 

 

 

 

Содержание SBU IO-Link

Страница 1: ...ns not all possible type variants are shown Quick Guide in accordance with the EU RED Directive 2014 53 EU in accordance with the EC Machinery Directive 2006 42 EC English language version Revision 00...

Страница 2: ...5 B02 MOUNTING THE SBU IO LINK ON THE QUARTER TURN ACTUATOR 5 B03 ELECTRICAL CONNECTION 6 B04 COMMISSIONING 6 B05 ERRORS IN GENERAL 8 B07 ERRORS CAUSE REMEDIAL ACTION 8 D STORAGE PACKAGING AND TRANSP...

Страница 3: ...ly instructions can be downloaded from our website www ebro armaturen com These original assembly instructions as well as all other information necessary for safe use must be available to all persons...

Страница 4: ...ers The SBU IO Link is suitable only for the non explosive zone and may be operated only with a 24 V DC power supply The SBU IO Link is used only in an area that is not potentially explosive The SBU I...

Страница 5: ...are required for all other interfaces The SBU IO Link may only be operated with the accessories foreseen and approved by EBRO ARMATUREN Gebr Br er GmbH The SBU IO Link should be mounted as follows Un...

Страница 6: ...The associated circuit diagram is affixed inside the inner housing cover Connect the SBU IO Link in accordance with the permissible voltage All electrical connections to the user side controller are t...

Страница 7: ...ly to the respective terminal see wiring diagram J8 Control SV1 Set Not set Control via IO Link external Control via IO Link Control by external signal J9 Control SV2 Set Not set Control via IO Link e...

Страница 8: ...connected properly If the red LED lights up the power supply polarity is reversed Correct polarity of the power supply is signalled by the green LED B06 Collective error Errors are signalled by the f...

Страница 9: ...BU IO Link should be protected against static discharge D02 Packaging The complete SBU IO Link from EBRO ARMATUREN Gebr Br er GmbH is packed safely and fit for purpose in accordance with the transport...

Страница 10: ...Quick Guide SBU IO Link Page 10 of 10...

Отзывы: