ebm-papst W6E500-KJ05-01 Скачать руководство пользователя страница 10

Operating instructions

W6E500-KJ05-01

Translation of the original operating instructions

4.4 Connection diagram

L

= U1 = blue

N

= U2 = black

PE

green/yellow

TW

Thermal overload protector gray (2x)

Item no. 15824-5-9970 · ENU · Change 230069 · Approved 2021-05-27 · Page 10 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W6E500-KJ05-01

Страница 1: ...ized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed ...

Страница 2: ...place any objects on the guard grill There must be sufficient space around the fan to be able to get past the fan 1 6 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long h...

Страница 3: ...rohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections ...

Страница 4: ...oduct drawing All dimensions in mm 1 Airflow direction V 2 Cable silicone 5G 0 5 mm 5x wire end ferrule Item no 15824 5 9970 ENU Change 230069 Approved 2021 05 27 Page 4 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...port struts only in X position as illustrated or rotor on bottom 2 For horizontal shaft installation position the cable exit must be at the bottom right Item no 15824 5 9970 ENU Change 230069 Approved 2021 05 27 Page 5 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 6: ...Specific ratio 1 pfs 100 000 Pa Data obtained at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 12 7 kg Size 500 mm Motor size 110 Rotor surface Painted black Blade material Press fitted sheet steel blank sprayed with PP plastic Fan housing material PP plastic Material guide vanes PP plasti...

Страница 7: ... A heated drip pan that reliably discharges any water emerging from the outflow side is available for the AxiCool fans ebm papst recommends the use of a drip pan in conjunction with the AxiCool heating tape The drip pan designed for the AxiCool fan housing is available from ebm papst under the following item number Size Item no 500 mm 41200 1 4050 Installation instructions are included with every ...

Страница 8: ...h the fan is installed so as to prevent it from being switched back on NOTE Water ingress into wires or cables Water ingresses at the customer cable end and can damage the device Make sure the end of the cable is connected in a dry environment and that the connection point is lower than the motor if possible Only connect the device to circuits that can be switched off with an all pole disconnectio...

Страница 9: ...y connect the device to circuits that can be switched off with an all pole disconnection switch When working on the device secure the system machine in which the device is installed so as to prevent it from being switched back on NOTE Lack of motor protection Without motor protection the motor can overheat and suffer damage Connect the thermal overload protector installed in the winding The motor ...

Страница 10: ...ction diagram L U1 blue N U2 black PE green yellow TW Thermal overload protector gray 2x Item no 15824 5 9970 ENU Change 230069 Approved 2021 05 27 Page 10 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 11: ...to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device CAUTION Electric charge on capaci...

Страница 12: ...rvals to the actual level of dust exposure 5 2 Safety inspection What to check How to check How often What action Contact protection cover for intactness or damage Visual inspection At least every 6 months Repair or replacement of device Device for damage to blades and housing Visual inspection At least every 6 months Replacement of device Fastening the cables Visual inspection At least every 6 mo...

Страница 13: ...external rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires are made of similar materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for inter...

Отзывы: