ebm-papst W4E400-ZE02-01 Скачать руководство пользователя страница 12

Operating instructions

W4E400-ZE02-01

Translation of the original operating instructions

Motor not turning

Mechanical blockage

Switch off, isolate
from supply and
remove mechanical
blockage.

Line voltage faulty

Check line voltage,
restore power supply.

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Thermal overload
protector activated

Allow motor to cool
off, locate and rectify
cause of error,
release restart lockout
if necessary

Impermissible point of
operation

Check point of
operation

Motor
overtemperature

Ambient temperature
too high

Reduce ambient
temperature if possible

Deficient cooling

Improve cooling

In the event of further malfunctions, contact ebm-papst.

5.1 Cleaning

To ensure a long service life, check the fans regularly for proper
operation and soiling. The frequency of checking is to be adapted
accordingly depending on the degree of soiling.

DANGER
Risk of injury from rotating fan.

→ Only clean when not in motion. Interrupt the power supply,

secure against renewed switch-on. Secure against start-up,
prevent air flow.

;

Dirt deposits on the motor housing can cause overheating of the motor.

;

Soiling of the impeller can cause vibration that will shorten the service
life of the fan.

;

Severe vibration can destroy the fan.

;

In such cases, switch off the fan immediately and clean it.

;

The preferred method of cleaning is dry cleaning, e.g. using
compressed air.

;

Do not use aggressive cleaning agents!

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

cleaner.

→ Do not use any acid, alkali or solvent-basedcleaning

agents.

→ Do not use any pointed or sharp-edged objects for cleaning

;

Completely remove any cleaning agents used.

;

If severe corrosion is visible on load-bearing or rotating parts, switch
off the device immediately and replace it.

;

Repair of load-bearing or rotating parts is not permitted!

;

Operate the fan for 2 hours at maximum speed so that any water that
has ingressed can evaporate.

;

If cleaning does not eliminate vibrations, the fan may need to be
rebalanced. To have it rebalanced, contact ebm-papst.

;

The fan is equipped with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of 40,000
hours.

;

If bearing replacement is necessary after that period, contact ebm-
papst.

;

Adapt the maintenance intervals to the actual level of dust exposure.

5.2 Safety inspection

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Fastening the
protective earth
terminal

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Tightness of
cable gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Welds for crack
formation

Visual inspection At least every

6 months

Replace device

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

5.3 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.

Item no. 17155-5-9970 · ENU · Change 218407 · Approved 2021-04-23 · Page 12 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W4E400-ZE02-01

Страница 1: ...cal staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The...

Страница 2: ...nt 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the sys...

Страница 3: ...unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operati...

Страница 4: ...1 3 0 2 Nm Accessory part Guard grill 40070 2 4039 with oval head screw 60080 7 6201 4x can be fitted on the intake side Not included in scope of delivery The installation of accessories may change th...

Страница 5: ...l dimensions in mm 1 Guard grill 40070 2 4039 2 Oval head screw 60080 7 6201 4x Item no 17155 5 9970 ENU Change 218407 Approved 2021 04 23 Page 5 13 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673...

Страница 6: ...ake side mounting on suction nozzle The 6 5 mm holes must be pierced from the underside with a mandrel or similar tool We recommend using M6 cheese head screws with hexagon socket DIN 912 DIN EN ISO 4...

Страница 7: ...rial PP plastic galvanized sheet metal plate Fan housing material PP plastic Number of blades 5 Airflow direction V Direction of rotation Clockwise viewed toward rotor Degree of protection IP44 instal...

Страница 8: ...eck the protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capa...

Страница 9: ...4 3 Connection in terminal box 4 3 1 Preparing cables for connection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tig...

Страница 10: ...ions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 17155 5 9970 ENU Change 218407 Approved 2021 04 23 Page 10 13 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfin...

Страница 11: ...tire speed control range Severe vibration can arise for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges wit...

Страница 12: ...or 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The f...

Страница 13: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: