4.5 Open additional screwed cable glands

You have the ability to break a second cable gland opening through on
the terminal box.

WARNING
In event of a fault, the screwed cable gland is under
electrical voltage

Electric shock
→ Do not use metal cable glands for plastic terminal

boxes.

;

Screw the cable gland into the pre-cut thread using a screwdriver.
When doing so, note the tightening torques, see chapter 3.1 Product
drawing.

;

Remove the plastic tab that falls off when the wire is pressed through
into the terminal box.

Fig. 4: Screwed cable gland opening

4.6 Checking the connections

;

Make sure that the power is off (all phases).

;

Secure it from being switched on again.

;

Check the correct fit of the connection lines.

;

Screw the terminal box cover closed again. Terminal box tightening
torque, see chapter 3.1 Product drawing.

;

Make sure that the terminal box is correctly closed and sealed and
that all screws and screwed cable glands are properly tightened.

4.7 Switch on device

The device may only be switched on if it has been installed properly and
in accordance with its intended use, including the required safety
mechanisms and professional electrical connection. This also applies for
devices which have already been equipped with plugs and terminals or
similar connectors by the customer.

WARNING
Hot motor housing

Fire hazard
→ Ensure that no combustible or flammable materials are

located close to the fan.

;

Inspect the device for visible external damage and the proper function
of the protective features before switching it on.

;

Check the air flow paths of the fan for foreign objects and remove any
that are found.

;

Apply the nominal voltage to the voltage supply.

4.8 Switching off the device

;

Disconnect the device from the supply voltage at the main switch for
the supply line.

;

When disconnecting, be sure to disconnect the earth wire connection
last.

Item no. 14349-5-9970 · Revision 83262 · Release 2014-05-26 · Page 9 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W4E315-DS20-38

Страница 1: ...sed technical staff Only authorised specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety...

Страница 2: ...ng hair loose items of clothing and jewellery could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect...

Страница 3: ...particularly prohibited and may cause hazards Operating the device with an imbalance e g caused by dirt deposits or icing Opening the terminal box during operation Moving air that contains abrasive p...

Страница 4: ...have the unit mm 1 Direction of air flow A 2 Tightening torque 0 5 0 1 Nm 3 Cable diameter max 7 5 mm tightening torque 1 3 0 2 Nm Item no 14349 5 9970 Revision 83262 Release 2014 05 26 Page 4 11 ebm...

Страница 5: ...ition Shaft horizontal or rotor on bottom rotor on top on request Condensate discharge holes Rotor side Operation mode S1 Motor bearing Ball bearing Touch current acc IEC 60990 measuring network Fig 4...

Страница 6: ...earth must have a cross section equal to or greater than the outer conductor cross section We recommend the use of 105 C cables Ensure that the minimum cable cross section is at least AWG26 0 13 mm Ea...

Страница 7: ...vice Only connect the device to circuits which can be de energised with an all pole disconnection switch When working on the device the system machine in which the device is installed must be secured...

Страница 8: ...tructions 4 4 Connection screen L blue N black PE green yellow TOP grey Item no 14349 5 9970 Revision 83262 Release 2014 05 26 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Ph...

Страница 9: ...that all screws and screwed cable glands are properly tightened 4 7 Switch on device The device may only be switched on if it has been installed properly and in accordance with its intended use includ...

Страница 10: ...tage faulty Check mains supply voltage restore power supply Faulty connection De energise correct connection see connection diagram Thermal overload protector responded Allow motor to cool off locate...

Страница 11: ...d seams for crack formation Visual inspection At least every 6 months Replace device Item no 14349 5 9970 Revision 83262 Release 2014 05 26 Page 11 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 7467...

Страница 12: ...AQ02 09 R2D140 AB02 14 R2D220 AA24 13 R3G310 AL09 30 R4E180 AS11 09 R4E400 AP15 10 REF100 11 14 S2E250 AL06 12 S4E300 AS72 50 S4E450 AU03 02 9496 2 4039 1 A2D250 AA02 18 A2E300 AP02 01 A4E300 AS72 01...