Operating instructions

W3G910-OV12-05

Translation of the original operating instructions

1.11 Storage

;

Store the device, partially or fully assembled, in a dry place,
protected against the weather and free from vibration, in the original
packaging in a clean environment.

;

Protect the device against environmental effects and dirt until final
installation.

;

We recommend storing the device for no longer than one year in
order to guarantee trouble-free operation and the longest possible
service life.

;

Even devices explicitly intended for outdoor use are to be stored as
described prior to commissioning.

;

Maintain the storage temperature, see
Chapter 3.6 Transport and storage conditions.

;

Make sure that all cable glands are fitted with dummy plugs.

2. INTENDED USE

The device is exclusively designed as a built-in device for conveying
air according to its technical data.
Any other usage above and beyond this does not conform with the
intended purpose and constitutes misuse of the device.
Customer equipment must be capable of withstanding the mechanical
and thermal stresses that can arise from this product. This applies for the
entire service life of the equipment in which this product is installed.

Intended use also includes

The device is only to be used in power systems with grounded
neutral (TN/TT power systems), in power systems with phase
conductor grounding, or in IT power systems.

The device is to be used in networks with network quality
characteristics as per EN 50160.

Using the device only in stationary systems.

Performing all maintenance work.

Conveying air at an ambient air pressure between 800 mbar and
1050 mbar.

Using the device within the permitted ambient temperature range; see
Chapter 3.6 Transport and storage conditions and
Chapter 3.2 Nominal data.

Operating the device with all protective devices.

Following the operating instructions.

Improper use

In particular, operating the device in the following ways is prohibited and
could be hazardous:

Operating the device in an unbalanced state, e.g. due to dirt deposits
or ice formation.

Resonant operation, operation with severe vibration. This also
includes vibration transmitted to the fan from the customer installation.

Operation in medical equipment with a life-sustaining or life-support
function.

Conveying solids in the flow medium.

Painting the device

Connections (e.g. screws) coming loose during operation.

Opening the terminal box during operation.

Conveying air that contains abrasive particles.

Conveying highly corrosive air, e.g. salt spray. Exception: devices
designed for salt spray and correspondingly protected.

Conveying air with high dust content, e.g. suctioning off sawdust.

Operating the device close to flammable materials or components.

Operating the device in an explosive atmosphere.

Using the device as a safety component or to perform safety-related
functions.

Operation with completely or partially disassembled or manipulated
protective devices.

In addition, all applications not listed among the intended uses.

Item no. 56518-5-9970 · ENU · Change 242238 · Approved 2021-10-28 · Page 3 / 16

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W3G910-OV12-05

Страница 1: ...o carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following...

Страница 2: ...g in conjunction with open and closed loop control devices If impermissible radiation levels occur following installation appropriate shielding measures have to be taken by the user NOTE Electrical or...

Страница 3: ...stationary systems Performing all maintenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter...

Страница 4: ...designed for PVC cables If the cable materials are different the tightening torque may have to be adjusted 3 Tightening torque 1 5 0 2 Nm 4 Tightening torque 3 0 3 Nm 5 Attachment holes for FlowGrid 9...

Страница 5: ...rings The dimensions must be requested from ebm papst If other air conduction geometries are used on the installation side the ebm papst evaluation loses its validity the conformity must be confirmed...

Страница 6: ...ngement is in the range 16 75 A this arrangement conforms to IEC 61000 3 12 provided that the short circuit power Ssc at the connection point of the customer system to the public power grid is greater...

Страница 7: ...e that the minimum cable cross section is at least AWG 26 0 13 mm Protective earth contact resistance according to EN 61800 5 1 Compliance with the resistance specifications according to EN 61800 5 1...

Страница 8: ...6228 1 for flexible cable 0 25 mm 4 mm NOTE The cable and cable cross section must be selected taking into account the max starting current of the drive and the type of cable routing see Chapter 4 2 2...

Страница 9: ...e sealing surfaces are clean Screw in the four screws for tightening torque see Chapter 3 1 Product drawing 4 3 4 Cable routing Water must be prevented from reaching the cable gland along the cable NO...

Страница 10: ...eristic curve P1 IN SELV CON2 IO3 Function parameterizable see Optional interface functions table Factory setting Analog output 0 10 V max 5 mA function Fan modulation level Characteristic curve param...

Страница 11: ...159 0 Ain2 0 10V PWM analog input D159 2 Ri 100K characteristic curve parameterizable f PWM 1k 10KHz SELV Ain2 4 20mA analog input Ri 125R characteristic curve parameterizable SELV D159 3 Din3 active...

Страница 12: ...operating instructions 4 7 Equivalent circuit diagrams Item no 56518 5 9970 ENU Change 242238 Approved 2021 10 28 Page 12 16 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0 793...

Страница 13: ...supply Switching off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the p...

Страница 14: ...us LED orange Message at status relay 1 Current limitation in action 2 Line impedance too high DC link voltage unstable 3 Power limiter in action 4 Output stage temperature high 5 Motor temperature hi...

Страница 15: ...ls to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing voltage is applied Test...

Страница 16: ...num Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Onl...

Отзывы: