background image

Operating instructions

W3G800-CU25-80

Translation of the original operating instructions

4.6 Checking connections

;

Ensure isolation from supply (all phases).

;

Make sure a restart is impossible

;

Check the cables for proper fit.

;

Screw the terminal box cover back on again. Terminal box tightening
torque, see Chapter 3.1 Product drawing.

;

Route the cables in the terminal box so that the terminal box cover
closes without resistance.

;

Use all screw plugs. Insert the screws by hand to avoid damage to
the threads.

;

Make sure the terminal box is completely closed and sealed and that
all screws and cable glands have been properly tightened.

4.7 Switching on the device

The device may only be switched on if it has been installed properly and
in accordance with its intended use, including the required safety
mechanisms and professional electrical hookup. This also applies for
devices which have already been equipped with plugs and terminals or
similar connectors by the customer.

WARNING
Hot motor housing

Risk of fire
→ Ensure that no combustible or flammable materials are

located close to the fan.

;

Before switching on, check the device for visible external damage
and make sure the protective devices are functional.

;

Check the fan's air flow paths for foreign matter and remove any
foreign matter found.

;

Apply the nominal supply voltage.

;

Start the device by changing the input signal.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ Low-vibration operation of the fan must be ensured over the

entire speed control range.

→ Severe vibration can arise for instance from inexpert

handling, transportation damage and resultant imbalance or
be caused by component or structural resonance.

→ Speed ranges with excessively high vibration levels and

possibly resonant frequencies must be determined in the
course of fan commissioning.

→ Either run through the resonant range as quickly as

possible with speed control or find another remedy.

→ Operation with excessively high vibration levels can

lead to premature failure.

4.8 Switching off the device

Switching off the device during operation:

;

Switch off the device via the control input.

;

Do not switch the motor (e.g. in cyclic operation) on and off via power
supply.

Switching off the device for maintenance:

;

Switch off the device via the control input.

;

Do not switch the motor (e.g. in cyclic operation) on and off via power
supply.

;

Disconnect the device from the power supply.

;

When disconnecting, be sure to disconnect the ground connection last.

5. INTEGRATED PROTECTIVE FEATURES

The integrated protective functions cause the motor to switch off
automatically in the event of the faults described in the table.

Fault

Safety feature description/
function

Rotor position detection error

An automatic restart follows.

Blocked rotor

;

After the blockage is

removed, the motor restarts
automatically.

Line undervoltage (line voltage
outside of permitted nominal
voltage range)

;

If the line voltage returns to

permitted values, the motor
restarts automatically.

Phase failure

A phase of the supply voltage
fails for at least 5 s.

;

When all phases are correctly

supplied again, the motor
automatically restarts after 10-40
s.

6. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Send the device to ebm-
papst for repair or replacement.

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
If control voltage or a stored speed set value is applied,
the motor will restart automatically, e.g. after a power
failure.

Risk of injury
→ Keep out of the device’s danger zone.
→ When working on the device, switch off the line voltage

and ensure that it cannot be switched back on.

→ Wait until the device comes to a stop.
→ After working on the device, remove any tools or other

objects from the device.

NOTE

If the device is not operated for a lengthy period in installed
condition in a dry environment, it is to be started up and
operated at full speed for one hour at least every four months. If
the device is not operated for a lengthy period in installed
condition in a damp environment (e.g. outdoors), it is to be
started up and operated at full speed for at least three hours
once a month to move the bearings and allow any condensate
that may have ingressed to evaporate.

Malfunction/fault

Possible cause

Possible remedy

Item no. 55047-5-9970 · ENU · Change 212910 · Approved 2020-11-18 · Page 12 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W3G800-CU25-80

Страница 1: ...ecialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated w...

Страница 2: ...g in conjunction with open and closed loop control devices If impermissible radiation levels occur following installation appropriate shielding measures have to be taken by the user NOTE Electrical or...

Страница 3: ...stationary systems Performing all maintenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter...

Страница 4: ...s in mm 1 Direction of air flow A 2 Cable diameter min 5 mm max 13 mm tightening torque 4 0 6 Nm 3 Tightening torque 3 5 0 5 Nm Item no 55047 5 9970 ENU Change 212910 Approved 2020 11 18 Page 4 14 ebm...

Страница 5: ...evel The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 47 6 kg Size 800 mm Motor size 150 Rotor surface Painted black E...

Страница 6: ...o the public power system is greater than or equal to 120 times the rated output of the arrangement It is the responsibility of the installation engineer or operator owner of the device to ensure if n...

Страница 7: ...with the resistance specifications according to EN 61800 5 1 for the protective earth connection circuit must be verified in the end application Depending on the installation situation it may be neces...

Страница 8: ...remove caps where cables are fed in Equip the cable glands with the seals provided in the terminal box Route the wire s not included in scope of delivery into the terminal box First connect the PE pr...

Страница 9: ...de for the device by ebm papst Mode parameter set 1 PWM control Mode parameter set 2 PWM control Fan device address 01 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value requirement Analog l...

Страница 10: ...contact changeover contact common connection contact rating 250 VAC max 2 A AC1 min 10 mA KL2 3 NC Status relay floating status contact break for failure KL 3 1 RSA Bus connection RS485 RSA MODBUS RTU...

Страница 11: ...EEPROM setting the integrated controller s direction of action can be selected via bus or digital input Din3 normal pin open or applied voltage 5 50 VDC inverse bridge to GND or applied voltage 1 VDC...

Страница 12: ...supply Switching off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the p...

Страница 13: ...ly for proper operation and soiling The frequency of checking is to be adapted accordingly depending on the degree of soiling DANGER Risk of injury from rotating fan Only clean when not in motion Do n...

Страница 14: ...rve the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also t...

Отзывы: