Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.

→ If this is not possible, a drip edge can be produced by

fitting a cable tie directly in front of the cable gland for example.

Fans installed lying flat

Make sure the cable is routed in a U-shaped loop.

Fig. 2: Fan installed lying flat, cable routed in a U-shaped loop.

Fans installed upright

When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

Fig. 3: Cable routing for fans installed upright.

4.4 Factory settings

Factory settings made for the device by ebm-papst.

Mode parameter set 1

PWM control

Mode parameter set 2

PWM control

Fan/device address

1

Max. PWM / %

100

Min. PWM / %

10

Save set value to
EEPROM

No

Set value requirement

Analog (linear)

Direction of action
parameter set 1

Positive (heating)

Direction of action
parameter set 2

Positive (heating)

Item no. 58074-5-9970 · ENU · Change 264288 · Approved 2022-07-20 · Page 8 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W3G300-XG06-01

Страница 1: ...trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rule...

Страница 2: ...appropriate shielding measures have to be taken by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compl...

Страница 3: ...be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fa...

Страница 4: ...Cable diameter min 4 mm max 10 mm tightening torque 1 8 0 3 Nm 3 Cable diameter min 6 mm max 10 mm tightening torque 1 8 0 3 Nm use must be made of seal provided Cable diameter min 4 mm max 7 mm tigh...

Страница 5: ...d from ebm papst If other air conduction geometries are used on the installation side the ebm papst evaluation loses its validity the conformity must be confirmed again The product does not fall withi...

Страница 6: ...kaging by the fan housing Strictly avoid shocks Wear safety shoes and cut resistant safety gloves CAUTION The blades of the impeller could be damaged Carefully set down the fan on a soft surface Make...

Страница 7: ...r is at a standstill and the line voltage is switched on The values are typically in the range 250 mA At the same time the effective power in this operating state operational readiness is typically 4...

Страница 8: ...fitting a cable tie directly in front of the cable gland for example Fans installed lying flat Make sure the cable is routed in a U shaped loop Fig 2 Fan installed lying flat cable routed in a U shape...

Страница 9: ...ontact common connection contact rating 250 VAC 2 A AC1 min 10 mA basic insulation on supply side and reinforced insulation on control interface side 8 GND Reference ground for control interface SELV...

Страница 10: ...he motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply When disconnecting be sure to disconnect the ground connection last 5 INTEGRATED PROTECTIVE FEA...

Страница 11: ...witch off the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporat...

Страница 12: ...nts could drop off during disassembly This can result in fatal or serious injury and material damage Secure components before unfastening to stop them falling 6 3 3 Component disposal The products are...

Отзывы: