4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.

4.3.1 Cable routing

Water must be prevented from reaching the cable exit along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.

→ If this is not possible, a drip edge can be produced by

fitting a cable tie directly in front of the cable gland for example.

Fans installed lying flat

Fig. 1: Fan installed lying flat, cable routed in a U-shaped loop.

Fans installed upright

Fig. 2: Cable routing for fans installed upright. The cables must always
be routed downward.

Item no. 14444-5-9970 · ENU · Change 227464 · Approved 2021-02-26 · Page 7 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W2E250-CB05-51

Страница 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Страница 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Страница 3: ...d be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the...

Страница 4: ...Product drawing All dimensions in mm 1 Direction of air flow V 2 Cable PVC AWG20 4x crimped splices Item no 14444 5 9970 ENU Change 227464 Approved 2021 02 26 Page 4 11 ebm papst Mulfingen GmbH Co KG...

Страница 5: ...h standards EN 60034 1 EN 60204 1 EN 60335 1 Comment on CE Commissioning not permitted in the European Economic Area Approval UL 507 With regard to cyclic speed loads note that the rotating parts of t...

Страница 6: ...er the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the informati...

Страница 7: ...ent at the cable glands To prevent the constant accumulation of water at the cable glands the cable should be routed in a U shaped loop wherever possible If this is not possible a drip edge can be pro...

Страница 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 14444 5 9970 ENU Change 227464 Approved 2021 02 26 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...ng the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Condensation drainage holes f...

Страница 11: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: