background image

Operating instructions

W2E208-BA20-51

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

Item no. 11148-5-9970 · ENU · Change 213116 · Approved 2022-09-13 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W2E208-BA20-51

Страница 1: ...orted unpacked installed operated maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry ou...

Страница 2: ...dy parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rot...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...ECHNICAL DATA 3 1 Product drawing All dimensions in mm 1 Direction of air flow V Item no 11148 5 9970 ENU Change 213116 Approved 2022 09 13 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673...

Страница 5: ...class I with customer connection of protective earth Motor capacitor according to EN 60252 1 in safety protection class S0 Conformity with standards EN 60335 1 CE Approval CSA C22 2 No 113 UL 507 EAC...

Страница 6: ...ent level indicated on the nameplate For determining the cross section note the sizing criteria according to EN 61800 5 1 The protective earth must have a cross section equal to or greater than that o...

Страница 7: ...ons Insert the wires into the terminals see Chapter 4 4 Connection diagram Item no 11148 5 9970 ENU Change 213116 Approved 2022 09 13 Page 7 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfi...

Страница 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 11148 5 9970 ENU Change 213116 Approved 2022 09 13 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...he protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Welds for crack formation Visual...

Страница 11: ...The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the...

Отзывы: