ebm-papst W2E142-BB05-87 Скачать руководство пользователя страница 8

Operating instructions

W2E142-BB05-87

Translation of the original operating instructions

4.4 Connection diagram

1

Fan connection diagram

L

blue

N

blue

2

Hall IC circuit

2.1

Hall IC

2.2

red (+5 V)

2.3

white (out)

2.4

black (0 V)

Item no. 10914-5-9970 · ENU · Change 209850 · Approved 2020-01-30 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W2E142-BB05-87

Страница 1: ...d otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electri...

Страница 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...l dimensions in mm 1 Cable PVC AWG26 3x splice 2 2x flat plug 2 8 x 0 5 mm 3 M4 screw for fastening ground connector Item no 10914 5 9970 ENU Change 209850 Approved 2020 01 30 Page 4 11 ebm papst Mulf...

Страница 5: ...ection class S0 Conformity with standards EN 60335 1 CE Approval CSA C22 2 No 113 UL 507 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one...

Страница 6: ...s installed so as to prevent it from being switched back on NOTE Water ingress into wires or cables Water ingress at the customer end of the cable can damage the device Make sure the end of the cable...

Страница 7: ...estroy the coil insulation system and against harmful bearing currents Heating up of the motor when using a variable frequency drive must be checked by the customer following installation in the end d...

Страница 8: ...n connection diagram L blue N blue 2 Hall IC circuit 2 1 Hall IC 2 2 red 5 V 2 3 white out 2 4 black 0 V Item no 10914 5 9970 ENU Change 209850 Approved 2020 01 30 Page 8 11 ebm papst Mulfingen GmbH C...

Страница 9: ...necting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or re...

Страница 10: ...ation of cables for damage Visual inspection At least every 6 months Replace cables Welds for crack formation Visual inspection At least every 6 months Replace device Abnormal bearing noise acoustic A...

Страница 11: ...s Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scra...

Отзывы: