background image

Operating instructions

W2D250-GA04-09

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Cable PVC, 4x crimped splices

3

Connection for speed monitoring brought out, AWG24-300V Hall generator, motor and Hall sensor wires not stripped

Item no. 10425-5-9970 · ENU · Change 236565 · Approved 2021-07-16 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W2D250-GA04-09

Страница 1: ...ned and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Страница 2: ...ndstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or da...

Страница 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Страница 4: ...r flow V 2 Cable PVC 4x crimped splices 3 Connection for speed monitoring brought out AWG24 300V Hall generator motor and Hall sensor wires not stripped Item no 10425 5 9970 ENU Change 236565 Approved...

Страница 5: ...eight 3 02 kg Size 250 mm Motor size 68 Rotor surface Painted black Impeller material Sheet steel hot dip galvanized Fan housing material Sheet steel pre galvanized and coated with black plastic Guard...

Страница 6: ...on Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capacity etc Route cables so that they cannot be to...

Страница 7: ...earth Connect the cables according to your application When doing so observe Chapter 4 5 Connection diagram 4 3 1 Cable routing Water must be prevented from reaching the cable exit along the cable NOT...

Страница 8: ...Y Star connection 2 red 5 V L1 black 3 white output L2 blue 4 black 0 V L3 brown 5 4 K7 TOP 2x gray PE green yellow Y Star connection L1 black L2 blue L3 brown Item no 10425 5 9970 ENU Change 236565 A...

Страница 9: ...connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and conn...

Страница 10: ...e device 5 3 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in acco...

Страница 11: ...ploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 10425 5 9970 ENU Change 236565 Approved 2021 07 16 Page 11 11 ebm papst Mulfinge...

Отзывы: