ebm-papst VBS0310CTPMS Скачать руководство пользователя страница 9

Operating instructions

8300100046

VBS0310CTPMS

Translation of the original operating instructions

4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.

Item no. 1170000725 · ENU · Change 238377 · Approved 2022-01-13 · Page 9 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание VBS0310CTPMS

Страница 1: ...ized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards assoc...

Страница 2: ...ental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entan...

Страница 3: ...ting instructions Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice...

Страница 4: ...102242 with pressure tap k factor 115 not included in scope of delivery 2 Max clearance for screw 16 mm 3 Cable PVC AWG18 6x wire end ferrule 4 Cable PVC AWG22 5x wire end ferrule Item no 1170000725 E...

Страница 5: ...k factor 115 1 Fastening holes for FlowGrid 25310 2 2957 not included in scope of delivery are provided and must be subsequently opened as required Item no 1170000725 ENU Change 238377 Approved 2022...

Страница 6: ...from ebm papst If other air conduction geometries are used on the installation side the ebm papst evaluation loses its validity the conformity must be confirmed again The product does not fall within...

Страница 7: ...ut of the arrangement It is the responsibility of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only...

Страница 8: ...itional protective earth conductor by way of the extra protective earth terminal provided on the device The protective earth terminal is located on the housing and provided with a protective earth sym...

Страница 9: ...ds First connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 1170000725 ENU Change 238377 Approved 2022 01 13...

Страница 10: ...rating 250 VAC 2 A AC1 min 10 mA reinforced insulation on supply side and basic insulation on control interface side 2 8 0 10V yellow Analog input set value 0 10 V Ri 100 k adjustable curve SELV 2 10...

Страница 11: ...m permissible vibration severity must not exceed 3 5 mm s and should be checked at intervals of 6 months It is to be determined at the motor mount at the motor support plate at least in axial directio...

Страница 12: ...olate from supply and remove mechanical blockage Line voltage faulty Check line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warn...

Страница 13: ...ssary after that period contact ebm papst Adapt the maintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors T...

Страница 14: ...ic Metallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings P...

Отзывы: