background image

Operating instructions

S6E350-AN24-50

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Tightening torque 1.5 ± 0.2 Nm

3

Cable diameter: max. 7.5 mm, tightening torque 1.3±0.2 Nm

Item no. 11669-5-9970 · ENU · Change 206200 · Approved 2019-11-19 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S6E350-AN24-50

Страница 1: ...ied trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are ...

Страница 2: ...ant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Inj...

Страница 3: ... unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loose during operation Opening the termin...

Страница 4: ...sions in mm 1 Direction of air flow V 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter max 7 5 mm tightening torque 1 3 0 2 Nm Item no 11669 5 9970 ENU Change 206200 Approved 2019 11 19 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...ction Thermal overload protector TOP internally connected with cable Axial Protection class I with customer connection of protective earth Motor capacitor according to EN 60252 1 in safety protection class S0 Conformity with standards EN 60335 1 CE Approval CCC EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If ...

Страница 6: ...pply and PE connections CAUTION Voltage The fan is a built in component and has no disconnecting switch Only connect the fan to circuits that can be switched off with an all pole disconnection switch When working on the fan secure the system machine in which the fan is installed so as to prevent it from being switched back on NOTE Water ingress into wires or cables Water ingress at the customer en...

Страница 7: ...gland Only remove caps where cables are fed in Route the wire s not included in scope of delivery into the terminal box First connect the PE protective earth Connect the wires to the corresponding terminals Use a screwdriver to do so When connecting ensure that no wire ends fan out The terminal strip is equipped with a penetration guard Insert the leads until they meet resistance Seal the terminal...

Страница 8: ...tions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 11669 5 9970 ENU Change 206200 Approved 2019 11 19 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 9: ...entire speed control range Severe vibration can arise for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed co...

Страница 10: ...for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball bearings is designed for a service life of 40 000 hours If bearing replacement is necessary after that period c...

Страница 11: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Отзывы: