ebm-papst S4E450-ZK04-01 Скачать руководство пользователя страница 10

Operating instructions

S4E450-ZK04-01

Translation of the original operating instructions

4.4 Connection diagram

L

= U1 = blue

Z

brown

N

= U2 = black

PE

green/yellow

TOP

gray

TOP

gray

Item no. 17063-5-9970 · ENU · Change 225416 · Approved 2021-01-26 · Page 10 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4E450-ZK04-01

Страница 1: ...cal staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The...

Страница 2: ...in operation Never step on the guard grill or subject the guard grill to load Do not place any objects on the guard grill There must be sufficient space around the fan to be able to get past the fan 1...

Страница 3: ...mbient temperature range see Chapter 3 6 Transport and storage conditions and Chapter 3 2 Nominal data Operating the device with all protective devices Following the operating instructions Improper us...

Страница 4: ...htening torque 1 5 0 2 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm 4 Accessory part Inlet ring 45100 2 4013 not included in scope of delivery Item no 17063 5 9970 ENU Change 2254...

Страница 5: ...ing instructions All dimensions in mm Inlet ring 45100 2 4013 Item no 17063 5 9970 ENU Change 225416 Approved 2021 01 26 Page 5 13 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49...

Страница 6: ...d at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Size 450 mm Motor size 94 Rotor surface Painte...

Страница 7: ...ke sure the impeller moves easily and that the blades of the impeller are not deformed or bent and do not catch at any point NOTE Damage to the device from vibration Bearing damage shorter service lif...

Страница 8: ...vide personal safety while operating the device 4 2 3 Voltage control NOTE Current overshoots may occur if speed control is implemented by transformers or electronic voltage regulators e g phase contr...

Страница 9: ...routing for fans installed upright 4 3 4 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tripping unit Only connect...

Страница 10: ...Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray TOP gray Item no 17063 5 9970 ENU Change 225416 Approved 2021 01 26 Page 10 13 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 746...

Страница 11: ...nt imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioni...

Страница 12: ...the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If clean...

Страница 13: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: