ebm-papst S4E450-AP01-05 Скачать руководство пользователя страница 4

Operating instructions

S4E450-AP01-05

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "A"

2

Tightening torque 0.5 Nm±0.1 Nm

3

Cable diameter: 7.5 mm, tightening torque 1.3±0.2 Nm

Item no. 12573-5-9970 · ENU · Change 202174 · Approved 2019-01-04 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4E450-AP01-05

Страница 1: ...hnical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules...

Страница 2: ...ence after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact wit...

Страница 3: ...unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operati...

Страница 4: ...sions in mm 1 Direction of air flow A 2 Tightening torque 0 5 Nm 0 1 Nm 3 Cable diameter 7 5 mm tightening torque 1 3 0 2 Nm Item no 12573 5 9970 ENU Change 202174 Approved 2019 01 04 Page 4 11 ebm pa...

Страница 5: ...ox material ABS plastic Blade material Sheet steel painted black Guard grille material Steel coated with black plastic RAL 9005 Number of blades 5 Airflow direction A Direction of rotation Clockwise v...

Страница 6: ...rotective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capacity etc...

Страница 7: ...nection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness...

Страница 8: ...ions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 12573 5 9970 ENU Change 202174 Approved 2019 01 04 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfing...

Страница 9: ...instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonan...

Страница 10: ...e Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operat...

Страница 11: ...The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the...

Отзывы: