background image

Operating instructions

S4E350-AA06-18

Translation of the original operating instructions

4.5 Opening additional cable glands

A second cable gland opening can be made in the terminal box.

WARNING
In the event of a fault, the cable gland is energized

Electric shock
→ Do not use metal cable glands with plastic terminal boxes.

;

Screw the cable gland into the precut thread using a wrench. When
doing so, take note of the tightening torques; see Chapter 3.1 Product
drawing.

;

Remove the plastic tab that fell off inside the terminal box when it was
penetrated.

Fig. 4: Cable gland opening

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

4.6 Checking connections

;

Ensure isolation from supply (all phases).

;

Make sure a restart is impossible

;

Check the cables for proper fit.

;

Screw the terminal box cover back on again. Terminal box tightening
torque, see Chapter 3.1 Product drawing.

;

Make sure the terminal box is completely closed and sealed and that
all screws and cable glands have been properly tightened.

4.7 Switching on the device

The device may only be switched on if it has been installed properly and
in accordance with its intended use, including the required safety
mechanisms and professional electrical hookup. This also applies for
devices which have already been equipped with plugs and terminals or
similar connectors by the customer.

WARNING
Hot motor housing

Risk of fire
→ Ensure that no combustible or flammable materials are

located close to the fan.

;

Before switching on, check the device for visible external damage
and make sure the protective devices are functional.

;

Check the fan's air flow paths for foreign matter and remove any
foreign matter found.

;

Apply the nominal supply voltage.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ Low-vibration operation of the fan must be ensured over the

entire speed control range.

→ Severe vibration can arise for instance from inexpert

handling, transportation damage and resultant imbalance or
be caused by component or structural resonance.

→ Speed ranges with excessively high vibration levels and

possibly resonant frequencies must be determined in the
course of fan commissioning.

→ Either run through the resonant range as quickly as

possible with speed control or find another remedy.

→ Operation with excessively high vibration levels can

lead to premature failure.

4.8 Switching off the device

;

Disconnect the device from the power supply at the supply line's
main switch.

;

When disconnecting, be sure to disconnect the ground connection last.

5. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Send the device to ebm-
papst for repair or replacement.

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
Electric charge on capacitor after device is switched off

Electric shock, risk of injury
→ Discharge the capacitors before working on the device.

CAUTION
The motor restarts automatically when operating voltage
is applied, e.g. after a power failure.

Risk of injury
→ Keep out of the device's danger zone.
→ When working on the device, switch off the line voltage

and ensure that it cannot be switched back on.

→ Wait until the device comes to a stop.

If the device is out of use for some time, e.g. when in storage,
we recommend switching it on for at least two hours to allow
any condensation to evaporate and to move the bearings.

Malfunction/fault

Possible cause

Possible remedy

Impeller not
running smoothly

Imbalance in rotating
parts

Clean the device;
replace it if imbalance
persists after cleaning.
Make sure no
weight clips are
removed during
cleaning.

Item no. 11928-5-9970 · ENU · Change 215290 · Approved 2021-10-20 · Page 9 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4E350-AA06-18

Страница 1: ...nd authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be ...

Страница 2: ...achine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or dangling clothing or jewelry while working on rotating parts Protect long hair with a cap 1 7 Emissions WARNING Depending on the installation and operating ...

Страница 3: ... unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loose during operation Opening the termin...

Страница 4: ...mensions in mm 1 Direction of air flow V 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter 7 5 mm tightening torque 2 0 3 Nm Item no 11928 5 9970 ENU Change 215290 Approved 2021 10 20 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...hin the scope of Regulation EU 2019 1781 due to the exception specified in Article 2 2a motors completely integrated into a product 3 4 Technical description Weight 4 7 kg Size 350 mm Motor size 68 Rotor surface Painted black Terminal box material PC ABS plastic Impeller material Sheet steel hot dip galvanized Guard grille material Steel phosphated and coated with black plastic Number of blades 5 ...

Страница 6: ...e fan must not be strained on fastening 4 2 Electrical connection DANGER Voltage on the device Electric shock Always connect a protective earth first Check the protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capacity etc Route cables so that they cannot be tou...

Страница 7: ...e 4 3 Connection in terminal box 4 3 1 Preparing cables for connection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness and strain relief are dependent on the cable used This must be checked by the user 4 3 2 Connecting wires to terminals Remove the cap fr...

Страница 8: ...tions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 11928 5 9970 ENU Change 215290 Approved 2021 10 20 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 9: ...entire speed control range Severe vibration can arise for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed co...

Страница 10: ...for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball bearings is designed for a service life of 40 000 hours If bearing replacement is necessary after that period c...

Страница 11: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Отзывы: