
Operating instructions
S4D400-AP12-77
Translation of the original operating instructions
4.4 Connection diagram
Change of rotation direction by reversing two phases, please use ID 369170 in future, as U1 and V1 are not correctly
assigned in the legend in the connection diagram
Three-phase motor
Y
Star connection
1
Counterclockwise operation
L1
= V1 = blue
L2
= U1 = black
L3
= W1 = brown
2
Clockwise operation
L1
= U1 = black
L2
= V1 = blue
L3
= W1 = brown
PE
green/yellow
Item no. 13050-5-9970 · ENU · Change 205355 · Approved 2019-11-28 · Page 8 / 11
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com