ebm-papst S4D300-AR34-17 Скачать руководство пользователя страница 10

Operating instructions

S4D300-AR34-17

Translation of the original operating instructions

5. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Return the device to ebm-
papst for repair or replacement.

WARNING
Terminals and connections have voltage even with a
unit that is shut off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
The motor restarts automatically when operating voltage
is applied, e.g. after a power failure.

Danger of injury
→ Keep out of the danger zone of the device.
→ When working on the device, switch off the mains

supply voltage and secure the latter from being switched on
again.

→ Wait until the device stops.

If the device remains out of use for some time, e.g. when in
storage, we recommend switching the device on for at least
two hours to allow any condensate to evaporate and to move
the bearings.

Malfunction/error

Possible cause

Possible remedy

Impeller running
roughly

Imbalance in rotating
parts

Clean the device; if
imbalance is still
evident after
cleaning, replace the
device.
If you have
attached any weight
clips during cleaning,
make sure to
remove them
afterwards.

Motor does not turn

Mechanical blockage

Switch off, de-
energise, and
remove mechanical
blockage.

Mains supply
voltage faulty

Check mains supply
voltage,
restore power
supply.

Faulty connection

De-energise, correct
connection, see
connection diagram.

Unacceptable
operating point

Check operating point

Overtemperature of
motor

Ambient temperature
too high

Lower ambient
temperature if possible

Insufficient cooling

Improve cooling

If you have any other problems, contact ebm-papst.

5.1 Cleaning

NOTE
Damage to the device during cleaning.

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

washer.

→ Do not use any cleaners containing acids,

bases or solvents.

→ Do not use any pointed or sharp-edged objects to clean.

5.2 Safety test

What has to
be tested?

How to test?

Frequency

Which
measure?

Check the
protective
casing against
accidental
contact for
damage and to
ensure that it is
intact

Visual inspection At least every

6 months

Repair or
replacement of
the device

Check the
device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement
of the device

Mounting the
connection lines

Visual inspection At least every

6 months

Fasten

Mounting of
protective
earth connection

Visual inspection At least every

6 months

Fasten

Check the
insulation of
the wires for
damage

Visual inspection At least every

6 months

Replace wires

Tightness of
screwed cable
gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensate
discharge
holes for
clogging, as
necessary

Visual inspection At least every

6 months

Open bore holes

Weld seams
for crack
formation

Visual inspection At least every

6 months

Replace device

Item no. 12338-5-9970 · Revision 77012 · Release 2012-04-25 · Page 10 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4D300-AR34-17

Страница 1: ...sed technical staff Only authorised specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety...

Страница 2: ...lled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect long hair by wearing a cap 1 7 Emission WARNING Depending on the installat...

Страница 3: ...ing the device in the following ways is particularly prohibited and may cause hazards Operating the device with an imbalance e g caused by dirt deposits or icing Opening the terminal box during operat...

Страница 4: ...have the unit mm 1 Direction of air flow V 2 Tightening torque 0 8 0 2 Nm 3 Cable diameter max 7 5 mm tightening torque 1 3 0 2 Nm Item no 12338 5 9970 Revision 77012 Release 2012 04 25 Page 4 10 ebm...

Страница 5: ...B Humidity class F2 2 Mounting position Shaft horizontal or rotor on bottom rotor on top on request Condensate discharge holes Rotor side Operation mode S1 Motor bearing Ball bearing Touch current ac...

Страница 6: ...st have a cross section equal to or greater than the outer conductor cross section We recommend the use of 105 C cables Ensure that the minimum cable cross section is at least AWG26 0 13 mm Earth wire...

Страница 7: ...rewed cable glands are arranged at the bottom The cables must always be routed downwards Fig 3 Cable routing for fans installed upright 4 3 4 Motor protection WARNING Device without overheating protec...

Страница 8: ...g two phases Three phase motor Delta connection Y Star connection L1 U1 black L2 V1 blue L3 W1 brown U2 green V2 white W2 yellow PE green yellow Item no 12338 5 9970 Revision 77012 Release 2012 04 25...

Страница 9: ...that all screws and screwed cable glands are properly tightened 4 7 Switch on device The device may only be switched on if it has been installed properly and in accordance with its intended use includ...

Страница 10: ...Unacceptable operating point Check operating point Overtemperature of motor Ambient temperature too high Lower ambient temperature if possible Insufficient cooling Improve cooling If you have any oth...

Отзывы: