ebm-papst R3G630-RA38-21 Скачать руководство пользователя страница 12

Operating instructions

R3G630-RA38-21

Translation of the original operating instructions

Check the
insulation of
the wires for
damage

Visual inspection At least every

6 months

Replace wires

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean or
replace impeller

Tightness of
screwed cable
gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensate
discharge
holes for
clogging, as
necessary

Visual inspection At least every

6 months

Open bore holes

Item no. 51874-5-9970 · Revision 82539 · Release 2014-05-08 · Page 12 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G630-RA38-21

Страница 1: ...o install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re e...

Страница 2: ...g on the system machine wait until all parts have come to a standstill DANGER Flying parts Missing safety devices may cause balancing weights or broken fan blades to be ejected at high speeds causing...

Страница 3: ...imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustaining or lifesaving function Operation with external vibrations Moving solids content in flow medium Pai...

Страница 4: ...3300 2 4013 not included in the standard scope of delivery 2 Depth of screw max 25 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 4 Tightening torque 3 5 0 5 Nm Item no 51874 5 9970...

Страница 5: ...g Ball bearing Technical features Output 10 VDC max 10 mA Output 20 VDC max 50 mA Output for slave 0 10 V Tach output Input for sensor 0 10 V or 4 20 mA External 24 V input programming External releas...

Страница 6: ...her the data on the type plate agree with the connection data Before connecting the device ensure that the supply voltage matches the operating voltage of the device Only use cables designed for curre...

Страница 7: ...es where cables are inserted Mount the screwed cable glands with the seal inserts provided in the terminal box Insert the line s not included in the standard scope of delivery into the terminal box Fi...

Страница 8: ...ter set 2 PWM controlling Fan device adress 1 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value control Analogue linear Control function parameter set 1 Positive heating Control function pa...

Страница 9: ...DC disabling bridge to GND or applied voltage 0 8 VDC reset function triggers software reset after a level change to 0 8 V KL3 8 Din2 Digital input 2 parameter set switch 1 2 according to EEPROM setti...

Страница 10: ...f the protective features before switching it on Check the air flow paths of the fan for foreign objects and remove any that are found Apply the nominal voltage to the voltage supply Start the device...

Страница 11: ...gise correct connection see connection diagram Overtemperature of electronics motor Insufficient cooling Improve cooling Let the device cool down To reset the error message switch off the mains supply...

Страница 12: ...every 6 months Clean or replace impeller Tightness of screwed cable gland Visual inspection At least every 6 months Retighten replace if damaged Condensate discharge holes for clogging as necessary V...

Отзывы: