background image

Operating instructions

R3G630-AP01-01

Translation of the original operating instructions

Fig. 1: Recommended stripped lengths in mm (inside terminal box)
Legend: CL = control lines

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Equip the cable glands with the seals provided in the terminal box.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

Fig. 2: Connecting wires to terminals

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.# If this is not possible, a drip edge can
be produced by fitting a cable tie directly in front of the cable
gland for example.

When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

Item no. 51092-5-9970 · ENU · Change 90396 · Approved 2016-09-21 · Page 9 / 15

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G630-AP01-01

Страница 1: ...alists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed when working on the device Keep the workpl...

Страница 2: ...alling the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause ...

Страница 3: ...use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Con...

Страница 4: ...70 2 4013 not included in scope of delivery 2 Max clearance for screw 25 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 4 Tightening torque 3 5 0 5 Nm Item no 51092 5 9970 ENU Change 90396 Approved 2016 09 21 Page 4 15 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ... All dimensions in mm Inlet ring 63070 2 4013 not included in scope of delivery Item no 51092 5 9970 ENU Change 90396 Approved 2016 09 21 Page 5 15 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 6: ...um efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 40 kg Size 630 mm Motor size 150 Rotor surface Painted black Electronics housing material Die cast aluminum Impeller material Sheet aluminum Number of blades 7 Direction of rotation Clockwise viewed toward rotor Degree of protection IP55 Insulation ...

Страница 7: ...er than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4 1 Mechanical connection CAUTION Cutting and crushing hazard when removing fan from packaging Carefully remove the device from its packaging by the fan impeller Strictly avoid shocks Wear safety shoes and cut resistant safety gloves CAUTION Device weighs over 25 kg Heavy load when unpacking device Risk of p...

Страница 8: ...quired fuses line protection only no equipment protection Nominal voltage Fuse Automatic circuit breaker Cable cross section Cable cross section VDE UL VDE mm AWG 3 PE AC 380 480 VAC 16 A 15 A C16A 1 5 16 3 PE AC 380 480 VAC 20 A 20 A C20A 2 5 14 3 PE AC 380 480 VAC 25 A 25 A C25A 4 0 12 AWG American Wire Gauge 4 2 3 Reactive currents Because of the EMC filter integrated for compliance with EMC li...

Страница 9: ...n connecting ensure that no wire ends fan out Fig 2 Connecting wires to terminals Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland along the cable NOTE Damage caused by moisture penetration Moisture can penetrate into the terminal box if water is constantly present at the cable glands To prevent the constant accumulation of water at the cable glands t...

Страница 10: ...meter set 2 PWM control Fan device address 1 Max PWM 100 Min PWM 5 1 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of action parameter set 2 Positive heating Item no 51092 5 9970 ENU Change 90396 Approved 2016 09 21 Page 10 15 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 ...

Страница 11: ...ronics enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 Switching parameter sets 1 2 according to EEPROM setting the valid or used parameter set can be selected via bus or via digital input DIN2 Parameter set 1 pin open or applied voltage 5 50 VDC Paramete...

Страница 12: ...essively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum permissible vibration severity must not exceed 3 5 mm s and should be checked at interv...

Страница 13: ...omatically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Deficient cooling Improve cooling Let the device cool down To reset the error message switch off the line voltage for at least 25 s and then switch it on again Alternatively reset the error message by applying a control signal ...

Страница 14: ...ce 6 4 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in accordance with ISO 14001 and rigorously implemented around the world on the basis of German standards Right from the development stage ecological design technical safety and health protection are fixed criteri...

Страница 15: ...materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 51092 5 9970 ENU Change 90396 A...

Отзывы: