4.2.4 Residual current operated device

Only universal (type B or B+) RCD protective devices are
permitted. Like frequency inverters, RCD protective devices
cannot provide personal safety while operating the device.
When switching on the power supply of the device, pulsed
charge currents from the capacitors in the integrated EMC filter
can lead to the RCD protective devices triggering without
delay. We recommend residual current devices with a trigger
threshold of 300 mA and delayed triggering (super-resistant,
characteristic K).

4.2.5 Leakage current

For asymmetrical power systems or if a phase fails, the
leakage current can increase to a multiple of the nominal value.

4.2.6 Locked-rotor protection

Due to the locked-rotor protection, the start-up current (LRA) is
equal to or less than the nominal current (FLA).

4.3 Connection in terminal box

4.3.1 Preparing connection lines for the connection

Strip the cable just enough so that the screwed cable gland is tight and
the terminals are relieved of strain. Tightening torque, see chapter 3.1
Product drawing.

Fig. 1: Recommended stripping lengths in mm (inside the terminal box)
Legend: CL = control lines

4.3.2 Connecting cables with terminals

WARNING
Terminals and connections have voltage even with a
unit that is shut off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the screwed cable gland.

Remove the cap only in those places where cables are inserted.

;

Mount the screwed cable glands with the seal inserts provided in the
terminal box.

;

Insert the line(s) (not included in the standard scope of delivery) into
the terminal box.

;

First connect the "PE" (protective earth) connection.

;

Connect the lines to the corresponding terminals.

Use a screwdriver to do so.

During the connection work, ensure that no cables splice off.

Fig. 2: Connecting the wires to terminals

;

Seal the terminal box.

4.3.3 Cable routing

No water may penetrate along the cable in the direction of the cable gland.
When routing the cable, ensure that the screwed cable glands are
arranged at the bottom. The cables must always be routed downwards.

Fig. 3: Cable routing for fans installed upright.

Item no. 50489-5-9970 · Revision 82539 · Release 2014-05-08 · Page 7 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G500-AG10-13

Страница 1: ...to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re...

Страница 2: ...g on the system machine wait until all parts have come to a standstill DANGER Flying parts Missing safety devices may cause balancing weights or broken fan blades to be ejected at high speeds causing...

Страница 3: ...imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustaining or lifesaving function Operation with external vibrations Moving solids content in flow medium Pai...

Страница 4: ...0 mm tightening torque 4 0 6 Nm 2 Accessory part Inlet nozzle 63072 2 4013 not included in the standard scope of delivery 3 Depth of screw max 25 mm 4 Tightening torque 3 5 0 5 Nm Item no 50489 5 9970...

Страница 5: ...or protection Protection class I if protective earth is connected by customer Product conforming to standard EN 61800 5 1 CE Approval CSA C22 2 Nr 77 EAC UL 2111 For cyclic speed loads note that the r...

Страница 6: ...ires Water enters at the cable end on the customers side and can damage the device Make sure that the cable end is connected in a dry environment Connect the device only to circuits that can be switch...

Страница 7: ...t drawing Fig 1 Recommended stripping lengths in mm inside the terminal box Legend CL control lines 4 3 2 Connecting cables with terminals WARNING Terminals and connections have voltage even with a un...

Страница 8: ...tion mode PWM controlling Group adress 1 Fan device adress 1 Max PWM 100 Min PWM 0 Save set value to EEPROM Yes Set value control Analog Control function Positive heating Item no 50489 5 9970 Revision...

Страница 9: ...quate to 100 level control coefficient KL3 2 8 GND Reference mass for control interface SELV KL3 3 7 0 10 V Use control actual value input 0 10 VDC impedance 100 k only as alternative to 4 20 mA input...

Страница 10: ...remove any that are found Apply the nominal voltage to the voltage supply Start the device by changing the input signal 4 8 Switching off the device Switching off the device during operation Switch of...

Страница 11: ...ge Switch off de energise and remove mechanical blockage Mains supply voltage faulty Check mains supply voltage restore power supply Important The error message resets automatically The device starts...

Страница 12: ...ainst accidental contact for damage and to ensure that it is intact Visual inspection At least every 6 months Repair or replacement of the device Check the device for damage to blades and housing Visu...

Отзывы: