background image

Operating instructions

R3G450-PW12-02

Translation of the original operating instructions

4.7 Equivalent circuit diagrams

Item no. 57700-5-9970 · ENU · Change 218409 · Approved 2020-09-18 · Page 13 / 18

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G450-PW12-02

Страница 1: ...test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation...

Страница 2: ...hine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate s...

Страница 3: ...Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited and could be haz...

Страница 4: ...earance for screw 20 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm The tightening torque is designed for PVC cables If the cable materials are different the tightening torque may h...

Страница 5: ...All dimensions in mm Inlet ring 45075 2 4013 with pressure tap k factor 240 Item no 57700 5 9970 ENU Change 218409 Approved 2020 09 18 Page 5 18 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Страница 6: ...on the installation side the ebm papst evaluation loses its validity the conformity must be confirmed again The product does not fall within the scope of Regulation EU 2019 1781 due to the exception s...

Страница 7: ...t It is the responsibility of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only connected to a conn...

Страница 8: ...uired fuses line protection only no equipment protection Nominal voltage Fuse Automatic circuit breaker Cable cross section Cable cross section VDE UL VDE mm AWG 3 PE AC 380 480 VAC 16 A 15 A C16A 1 5...

Страница 9: ...ferrules For flexible control and relay cables from a cable cross section of 1 0 mm a trapezoid crimp is required to ensure correct installation on the connector Fig 2 Trapezoid crimp 4 3 3 Connect c...

Страница 10: ...ox if water is constantly present at the cable glands To prevent the constant accumulation of water at the cable glands the cable should be routed in a U shaped loop wherever possible If this is not p...

Страница 11: ...eristic curve P1 IN SELV CON2 IO3 Function parameterizable see Optional interface functions table Factory setting Analog output 0 10 V max 5 mA function Fan modulation level Characteristic curve param...

Страница 12: ...159 0 Ain2 0 10V PWM analog input D159 2 Ri 100K characteristic curve parameterizable f PWM 1k 10KHz SELV Ain2 4 20mA analog input Ri 125R characteristic curve parameterizable SELV D159 3 Din3 active...

Страница 13: ...operating instructions 4 7 Equivalent circuit diagrams Item no 57700 5 9970 ENU Change 218409 Approved 2020 09 18 Page 13 18 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0 793...

Страница 14: ...ng Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum per...

Страница 15: ...atically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Deficient cooling Improve coo...

Страница 16: ...perating point Reduce ambient temperature Correct operating point Manual reset required 7 Hall sensor error Internal error Switch off line voltage wait switch back on 8 Motor blocked Mechanical blocka...

Страница 17: ...eller or replace device Tightness of cable gland Visual inspection At least every 6 months Retighten replace if damaged Condensation drainage holes for clogging where necessary Visual inspection At le...

Страница 18: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...