ebm-papst R3G280-AF35-71 Скачать руководство пользователя страница 8

Operating instructions

R3G280-AF35-71

Translation of the original operating instructions

4.5 Connection diagram

Drawing preliminary!

Item no. 50911-5-9970 · ENU · Change 211277 · Approved 2020-10-07 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G280-AF35-71

Страница 1: ...ts are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the...

Страница 2: ...ler Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing je...

Страница 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Страница 4: ...2 4013 not included in scope of delivery other inlet rings on request 2 Clearance for screw 8 10 mm 3 Cable AWG18 5x crimped ferrules 4 Cable AWG22 3x crimped ferrules Item no 50911 5 9970 ENU Change...

Страница 5: ...terial Sheet steel hot dip galvanized Number of blades 11 Direction of rotation Clockwise viewed toward rotor Degree of protection IP54 Insulation class B Moisture F Environmental H protection class H...

Страница 6: ...uld be isolated from vibration e g using compensators or similar elements Ensure stress free attachment of the fan to the substructure Check the device for transport damage Damaged devices are not to...

Страница 7: ...and the line voltage is switched on The values are typically in the range 250 mA At the same time the effective power in this operating state operational readiness is typically 4 W 4 2 3 Residual cur...

Страница 8: ...ting instructions 4 5 Connection diagram Drawing preliminary Item no 50911 5 9970 ENU Change 211277 Approved 2020 10 07 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49...

Страница 9: ...e during operation Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Switching off the device for maintenance Switch off the devic...

Страница 10: ...ice life check the fans regularly for proper operation and soiling The frequency of checking is to be adapted accordingly depending on the degree of soiling DANGER Risk of injury from rotating fan Onl...

Страница 11: ...s 6 4 1 Country specific legal requirements NOTE Country specific legal requirements Always observe the applicable country specific legal regulations with regard to the disposal of products or waste o...

Отзывы: