ebm-papst R3G250-BB09-S1 Скачать руководство пользователя страница 10

Operating instructions

R3G250-BB09-S1

Translation of the original operating instructions

Thermal overload
protector activated

Allow motor to cool
off, locate and rectify
cause of error,
release restart lockout
if necessary

Ambient temperature
too high

Reduce the ambient
temperature.
Reset by reducing
control input to 0.

Impermissible point of
operation

Correct the operating
point. Let the device
cool down.

In the event of further malfunctions, contact ebm-papst.

5.1 Cleaning

To ensure a long service life, check the fans regularly for proper
operation and soiling. The frequency of checking is to be adapted
accordingly depending on the degree of soiling.

;

Dirt deposits on the motor housing can cause overheating of the motor.

;

Soiling of the impeller can cause vibration that will shorten the service
life of the fan.

;

Severe vibration can destroy the fan.

;

In such cases, switch off the fan immediately and clean it.

;

The preferred method of cleaning is dry cleaning, e.g. using
compressed air.

;

Do not use aggressive cleaning agents!

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a high-pressure cleaner.# Do

not use acid, alkali or solvent-based cleaning agents.

→ Do not use any pointed or sharp-edged objects for

cleaning.

;

Completely remove any cleaning agents used.

;

If severe corrosion is visible on load-bearing or rotating parts, switch
off the device immediately and replace it.

;

Repair of load-bearing or rotating parts is not permitted!

;

Operate the fan for 2 hours at maximum speed so that any water that
has ingressed can evaporate.

;

If cleaning does not eliminate vibrations, the fan may need to be
rebalanced. To have it rebalanced, contact ebm-papst.

;

The fan is equipped with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of 40,000
hours.

;

If bearing replacement is necessary after that period, contact ebm-
papst.

;

Adapt the maintenance intervals to the actual level of dust exposure.

5.2 Safety inspection

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Fastening the
protective earth
terminal

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean impeller
or replace device

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

5.3 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.

5.3.1 Country-specific legal requirements

NOTE
Country-specific legal requirements

Always observe the applicable country-specific legal
regulations with regard to the disposal of products or waste
occurring in the various phases of the life cycle. The
corresponding disposal standards are also to be heeded.

5.3.2 Disassembly

Disassembly of the product must be performed or supervised by
qualified personnel with the appropriate technical knowledge.
The product is to be disassembled into suitable components for disposal
employing standard procedures for motors.

Item no. 56766-5-9970 · ENU · Change 257061 · Approved 2023-02-03 · Page 10 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G250-BB09-S1

Страница 1: ...ed and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the el...

Страница 2: ...customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure t...

Страница 3: ...ns Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Reso...

Страница 4: ...delivery 2 Max clearance for screw 16 mm 3 Cable halogen free railway application EN 45545 4G 1 5 mm 3x wire end ferrule 1x wire not routed externally 4 Cable halogen free railway application EN 4554...

Страница 5: ...sions in mm Inlet ring 25075 2 4013 with pressure tap not included in scope of delivery Item no 56766 5 9970 ENU Change 257061 Approved 2023 02 03 Page 5 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2...

Страница 6: ...dards EN 15085 1 CPC3 EN 45545 2 HL3 EN 50155 EN 61373 Cat 1B Approval EAC Comment If voltage e g 230 VAC is passed through the alarm relay the SELV signal wires lose their property of reinforced insu...

Страница 7: ...efore working on the electrical hookup short the supply and PE connections CAUTION Voltage The fan is a built in component and has no disconnecting switch Only connect the fan to circuits that can be...

Страница 8: ...contact contact rating 250 VAC 30 VDC max 2 A AC1 min 1 mA 5 VDC reinforced insulation on control interface side basic insulation on supply side in accordance with EN 50124 1 2 8 0 10 V yellow Analog...

Страница 9: ...e from the power supply When disconnecting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the d...

Страница 10: ...el of dust exposure 5 2 Safety inspection What to check How to check How often What action Contact protection cover for intactness or damage Visual inspection At least every 6 months Repair or replace...

Страница 11: ...lating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets are used in external rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magn...