ebm-papst R2E250-AW50-13 Скачать руководство пользователя страница 7

Operating instructions

R2E250-AW50-13

Translation of the original operating instructions

4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.5 Connection diagram.

4.4 Connection of the Hall IC

The device has external leads.

;

Connect the cables according to your application. When doing so,
observe Chapter 4.5 Connection diagram.

Item no. 11419-5-9970 · ENU · Change 99365 · Approved 2018-04-27 · Page 7 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E250-AW50-13

Страница 1: ...ed by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installati...

Страница 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating de...

Страница 3: ...ticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operati...

Страница 4: ...ll IC Raychem cable 3X AWG24 connector housing Molex no 70107 0037 with 3x plug pin Molex no 16 02 0078 crimped 3 1 5 V red 3 2 out white 3 3 0 V black 4 Cable PFA 4G AWG20 4x crimped splices Capacito...

Страница 5: ...ection class S0 Conformity with standards EN 60034 1 EN 60204 1 Approval UL 1004 3 CSA C22 2 No 77 CCC With regard to cyclic speed loads note that the rotating parts of the device are designed for a m...

Страница 6: ...nnected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matche...

Страница 7: ...ion When doing so observe Chapter 4 5 Connection diagram 4 4 Connection of the Hall IC The device has external leads Connect the cables according to your application When doing so observe Chapter 4 5...

Страница 8: ...diagram U1 blue Z brown U2 black PE green yellow 2 Hall IC circuit 2 1 Hall IC 2 2 red 5 V 2 3 white out 2 4 black 0 V Item no 11419 5 9970 ENU Change 99365 Approved 2018 04 27 Page 8 10 ebm papst Mul...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...ents Always observe the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal stan...

Отзывы: