background image

Operating instructions

R2E225-BD92-19

Translation of the original operating instructions

4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.5 Connection diagram.

4.4 Connection of the Hall IC

The device has external leads.

;

Connect the cables according to your application. When doing so,
observe Chapter 4.5 Connection diagram.

Item no. 10530-5-9970 · ENU · Change 202174 · Approved 2019-01-03 · Page 7 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E225-BD92-19

Страница 1: ...ed by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installati...

Страница 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating dev...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...crimped splices 2 Cable 3x crimped splices 3 Accessory part inlet ring 96358 2 4013 not included in scope of delivery 4 Max clearance for screw 5 mm Item no 10530 5 9970 ENU Change 202174 Approved 20...

Страница 5: ...004 1 CSA C22 2 No 100 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm paps...

Страница 6: ...e disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the informa...

Страница 7: ...on When doing so observe Chapter 4 5 Connection diagram 4 4 Connection of the Hall IC The device has external leads Connect the cables according to your application When doing so observe Chapter 4 5 C...

Страница 8: ...diagram U1 blue Z brown U2 black PE green yellow 2 Hall IC circuit 2 1 Hall IC 2 2 red 5 V 2 3 white out 2 4 black 0 V Item no 10530 5 9970 ENU Change 202174 Approved 2019 01 03 Page 8 10 ebm papst Mu...

Страница 9: ...your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltag...

Страница 10: ...cific legal requirements NOTE Country specific legal requirements Always observe the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the var...

Отзывы: