ebm-papst R2E225-AG03-11 Скачать руководство пользователя страница 7

Operating instructions

R2E225-AG03-11

Translation of the original operating instructions

4.3 Connection via terminal strip

4.3.1 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Insert the wires into the terminals, see
Chapter 4.4 Connection diagram.

Item no. 14585-5-9970 · ENU · Change 257459 · Approved 2022-05-06 · Page 7 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E225-AG03-11

Страница 1: ...otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrica...

Страница 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...lvanized 2 Centrifugal fan impeller sheet steel rust and acid resistant 3 1 L blue 3 2 N black 3 3 Z brown 4 M4 screw for fastening ground connector Max clearance for screw 5 mm Item no 14585 5 9970 E...

Страница 5: ...connection point Conformity with standards CE Use the device in accordance with its degree of protection Information on surface quality The surfaces of the products conform to the generally applicable...

Страница 6: ...re the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the inform...

Страница 7: ...device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device Insert the wires into the terminals see Chapter 4 4 Connection diagram Item...

Страница 8: ...g instructions 4 4 Connection diagram U1 blue Z brown U2 black Item no 14585 5 9970 ENU Change 257459 Approved 2022 05 06 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 4...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...n Visual inspection At least every 6 months Replace device Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disposal For ebm papst environmental protection and resource prese...

Страница 11: ...ectrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 14585 5 9970 ENU Change...

Отзывы: