background image

Operating instructions

R2E180-AS77-40

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Accessory part: Inlet ring 09576-2-4013, not included in scope of delivery

2

Cable PFA 4G AWG20, 4x crimped splices

3

Max. clearance for screw 5 mm

Item no. 11360-5-9970 · ENU · Change 202174 · Approved 2019-01-03 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E180-AS77-40

Страница 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Страница 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...essory part Inlet ring 09576 2 4013 not included in scope of delivery 2 Cable PFA 4G AWG20 4x crimped splices 3 Max clearance for screw 5 mm Item no 11360 5 9970 ENU Change 202174 Approved 2019 01 03...

Страница 5: ...l CCC UL 1004 3 EAC CSA C22 2 No 77 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions con...

Страница 6: ...formation on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the information on the...

Страница 7: ...st connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 11360 5 9970 ENU Change 202174 Approved 2019 01 03 Page...

Страница 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 11360 5 9970 ENU Change 202174 Approved 2019 01 03 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...astening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Impeller for wear depos...

Страница 11: ...ires are made of similar materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for i...

Отзывы: