4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.

Item no. 10288-5-9970 · ENU · Change 202174 · Approved 2018-12-28 · Page 7 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E146-AW07-05

Страница 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Страница 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...ces 2 Accessory part inlet ring 09576 2 4013 not included in scope of delivery 3 Max clearance for screw 5 mm 4 Direction of rotation clockwise viewed toward rotor Item no 10288 5 9970 ENU Change 2021...

Страница 5: ...1 CE Approval EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for...

Страница 6: ...formation on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the information on the...

Страница 7: ...st connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 10288 5 9970 ENU Change 202174 Approved 2018 12 28 Page...

Страница 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 10288 5 9970 ENU Change 202174 Approved 2018 12 28 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...least every 6 months Fasten Fastening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace c...

Страница 11: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...