background image

Operating instructions

R2E140-AE77-05

Translation of the original operating instructions

4.4 Connection diagram

U1

blue

Z

brown

U2

black

PE

green/yellow

Item no. 11045-5-9970 · ENU · Change 89436 · Approved 2017-01-23 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E140-AE77-05

Страница 1: ...nly be transported unpacked installed operated maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the devic...

Страница 2: ...e system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device...

Страница 3: ...ticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operati...

Страница 4: ...essory part inlet ring 09576 2 4013 not included in scope of delivery 2 Max clearance for screw 5 mm 3 Cable PVC 4G 0 5 mm 4x crimped splices Item no 11045 5 9970 ENU Change 89436 Approved 2017 01 23...

Страница 5: ...nsions in mm 1 Accessory part inlet ring 09576 2 4013 not included in scope of delivery Item no 11045 5 9970 ENU Change 89436 Approved 2017 01 23 Page 5 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Страница 6: ...5 1 CE Approval CCC EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm pap...

Страница 7: ...irements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor m...

Страница 8: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 11045 5 9970 ENU Change 89436 Approved 2017 01 23 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...egulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly o...

Отзывы: