background image

Operating instructions

R2E133-BH66-05

Translation of the original operating instructions

4.4 Connection diagram

U1

blue

Z

brown

U2

black

PE

green/yellow

Item no. 10277-5-9970 · ENU · Change 98149 · Approved 2018-07-24 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E133-BH66-05

Страница 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Страница 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating de...

Страница 3: ...ticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operati...

Страница 4: ...1 Accessory part Inlet ring 09566 2 4013 not included in scope of delivery 2 Max clearance for screw 5 mm 3 Cable PVC 4G 0 5 mm 4x splice Item no 10277 5 9970 ENU Change 98149 Approved 2018 07 24 Page...

Страница 5: ...nsions in mm 1 Accessory part inlet ring 09566 2 4013 not included in scope of delivery Item no 10277 5 9970 ENU Change 98149 Approved 2018 07 24 Page 5 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Страница 6: ...CCC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for support Use t...

Страница 7: ...in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the c...

Страница 8: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 10277 5 9970 ENU Change 98149 Approved 2018 07 24 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Страница 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Страница 10: ...al regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassemb...

Отзывы: