background image

Operating instructions

R1G120-AD13-13

Translation of the original operating instructions

4.5 Connection diagram

Drawing preliminary!

Item no. 55533-5-9970 · ENU · Change 89917 · Approved 2018-01-08 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R1G120-AD13-13

Страница 1: ...authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basi...

Страница 2: ...parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotat...

Страница 3: ...proper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant...

Страница 4: ...ivery 2 Max clearance for screw 4 mm 3 Max clearance for screw 4 mm 4 Cable PVC AWG20 4 pole connector housing TE 925075 7 3x plug pin TE 163555 8 4 1 Tach white 4 2 not used 4 3 UN 24 VDC red 4 4 GND...

Страница 5: ...ensions in mm Accessory part inlet ring 96120 2 4013 not included in scope of delivery Item no 55533 5 9970 ENU Change 89917 Approved 2018 01 08 Page 5 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Страница 6: ...of one million load cycles If you have special questions consult ebm papst for support Use the device in accordance with its degree of protection Information on surface quality The surfaces of the pr...

Страница 7: ...ll pole disconnection switch When working on the fan secure the system machine in which the fan is installed so as to prevent it from being switched back on NOTE Water ingress into wires or cables Wat...

Страница 8: ...ting instructions 4 5 Connection diagram Drawing preliminary Item no 55533 5 9970 ENU Change 89917 Approved 2018 01 08 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0...

Страница 9: ...t the supply line s main switch 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live te...

Страница 10: ...products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly of the product must be performed or superv...

Отзывы: