background image

Operating instructions

K3G900-AS08-01

Translation of the original operating instructions

4.2.6 Locked-rotor protection

Due to the locked-rotor protection, the starting current (LRA) is
equal to or less than the nominal current (FLA).

4.3 Connection in terminal box

4.3.1 Preparing cables for connection

Only strip the cable as far as necessary, ensuring that the cable gland is
sealed and there is no strain on the connections. For tightening torques,
see Chapter 3.1 Product drawing.

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.# If this is not possible, a drip edge can
be produced by fitting a cable tie directly in front of the cable
gland for example.

When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

4.4 Factory settings

Factory settings made for the device by ebm-papst.

Mode parameter set 1

PWM control

Mode parameter set 2

PWM control

Fan/device address

01

Max. PWM / %

100

Min. PWM / %

5

Save set value to
EEPROM

Yes

Set value requirement

Analog (linear)

Direction of action
parameter set 1

Positive (heating)

Direction of action
parameter set 2

Positive (heating)

Item no. 51810-5-9970 · ENU · Change 99339 · Approved 2018-04-27 · Page 8 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G900-AS08-01

Страница 1: ...e permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the devi...

Страница 2: ...come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate safety measures WARNING Rotatin...

Страница 3: ...mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 6 Transport and storage conditions and Chapter 3 2 Nominal data Operating the device with all protectiv...

Страница 4: ...ion for vibration absorbing elements 3 Cable diameter min 5 mm max 13 mm tightening torque 6 0 9 Nm 4 Cable diameter min 16 mm max 20 5 mm tightening torque 6 0 9 Nm 5 Tightening torque 3 5 0 5 Nm Ite...

Страница 5: ...Technical description Weight 220 kg Size 900 mm Motor size 200 Rotor surface Painted black Electronics housing material Die cast aluminum painted black Impeller material Sheet aluminum Inlet nozzle m...

Страница 6: ...or that this device is only connected to a connection point with an Ssc value greater than or equal to 250 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4 1 Mechanical connection...

Страница 7: ...ss section is at least AWG 26 0 13 mm Protective earth contact resistance according to EN 61800 5 1 Compliance with the resistance specifications according to EN 61800 5 1 for the protective earth con...

Страница 8: ...so When connecting ensure that no wire ends fan out Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland along the cable NOTE Damage caused by moisture pene...

Страница 9: ...ics enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 V KL 3 8 Din2 Digital input 2 Switching...

Страница 10: ...ssively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or...

Страница 11: ...matically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Deficient cooling Improve co...

Страница 12: ...ce device 6 4 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in acc...

Страница 13: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: