ebm-papst K3G710-PW06-01 Скачать руководство пользователя страница 6

Operating instructions

K3G710-PW06-01

Translation of the original operating instructions

Protection class

I (with customer connection of protective
earth)

Conformity with
standards

EN 61800-5-1; CE; UKCA

Approval

EAC; CSA C22.2 No. 77 + CAN/CSA-
E60730-1; UL 1004-7 + 60730-1

With regard to cyclic speed loads, note that the rotating parts of
the device are designed for a maximum of one million load
cycles. If you have special questions, consult ebm-papst for
support.

;

Use the device in accordance with its degree of protection.

Information on surface quality

The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may change during the production period.
This has no effect on strength, dimensional stability and dimensional
accuracy.
The color pigments in the paints used perceptibly react to UV light over
the course of time. The product is to be protected against UV radiation to
prevent the formation of patches and fading. Changes in color are not a
reason for complaint and are not covered by the warranty. UV radiation
in the frequency range and the intensity of natural solar radiation has no
effect on the technical properties of the products.

3.5 Mounting data

Further mounting data can be taken from the product drawing or Chapter
4.1 Mechanical connection as required.

Strength class of
screws

10.9

;

Secure the screws against unintentional loosening (e.g. use self-
locking screws).

3.6 Transport and storage conditions

Max. permitted
ambient temp. for
motor (transport/
storage)

+80 °C

Min. permitted
ambient temp. for
motor (transport/
storage)

-40 °C

3.7 Electromagnetic compatibility

EMC immunity to
interference

According to EN 61000-6-2 (industrial
environment)

EMC interference
emission

According to EN 61000-6-4 (industrial
environment)

If several devices are connected in parallel on the supply side
so that the line current of the arrangement is in the range 16 - 75
A, this arrangement conforms to IEC 61000-3-12, provided that
the short-circuit power S

sc at the connection point of the

customer system to the public power grid is greater than or
equal to 250 times the rated output of the arrangement. It is the
responsibility of the installation engineer or operator/owner of the
device to ensure, if necessary after consultation with the
network operator, that this device is only connected to a
connection point with an S

sc value greater than or equal to 250

times the rated output of the arrangement.

4. CONNECTION AND STARTUP

4.1 Mechanical connection

DANGER
Heavy and unwieldy device.

Crushing hazard
→ Do not grasp or transport the device by the fan impeller.

Move the device with a crane using ropes or cloth straps.
There are holes drilled in the support structure that can be
used for transport.

→ After installation, ensure that the blades on the fan

impeller are not deformed or bent.

Fig. 1: Make sure the RadiPac fan is firmly secured when transporting
on a pallet. The impeller is not to be subjected to load. If the impeller is
subjected to load (e.g. during transportation), the fan could be severely
damaged!

CAUTION
Risk of cutting and crushing when removing device
from packaging

→ Carefully remove the device from the packaging by grasping

hold of the frame. Never subject to any impact.

→ Wear safety shoes and cut-resistant safety gloves.

CAUTION
Device weighs over 25 kg! Heavy load when unpacking
device.

Risk of physical injury, such as back injuries.
→ Use suitable hoisting equipment to remove the device from

its packaging.

;

The fan may not be handled in the area around the inlet nozzle during
transport and installation.
There is a risk of damage to the impeller.

;

Check the device for transport damage. Damaged devices are not to
be installed.

;

Install the undamaged device in accordance with your application.

4.1.1 Installation of RadiPac fan

Use is always to be made of appropriate hoisting equipment and a
suitable lifting device when transporting the RadiPac for installation
purposes. Use only suitable ropes or chains (see Chapter 3.4 Technical
description for product weight). To attach the hoisting equipment, use four
M10 eye bolts that can turn under load; screw the eye bolts into the
tapped holes provided. For fans not provided with tapped holes, use the
existing holes and lock the threaded bolts that can turn (M8 or M10) on
the underside with a nut. Do not use standard DIN 580 eye bolts. Note
that the angle between the ropes or chains may be between 0° and 60°.
During transportation, an acceleration of 2 g must not be exceeded.

Item no. 55789-5-9970 · ENU · Change 260717 · Approved 2022-06-23 · Page 6 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G710-PW06-01

Страница 1: ...e permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the devi...

Страница 2: ...evice against accidental contact Before working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or brok...

Страница 3: ...forming all maintenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 6 Transport and stora...

Страница 4: ...ghtening torque 6 0 9 Nm 5 Tightening torque 3 5 0 5 Nm 6 Attachment holes for FlowGrid 50710 2 2957 not included in scope of delivery 7 Motor support plate Installation position shaft horizontal moto...

Страница 5: ...ts validity the conformity must be confirmed again The product does not fall within the scope of Regulation EU 2019 1781 due to the exception specified in Article 2 2a motors completely integrated int...

Страница 6: ...cessary after consultation with the network operator that this device is only connected to a connection point with an Ssc value greater than or equal to 250 times the rated output of the arrangement 4...

Страница 7: ...to wires or cables Water ingress at the customer end of the cable can damage the device Make sure the end of the cable is connected in a dry environment Only connect the device to circuits that can be...

Страница 8: ...here is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness and strain relief are dependent on the cable used This must be checked by the user 4 3 2 Conn...

Страница 9: ...cs enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 V KL 3 8 Din2 Digital input 2 Switching p...

Страница 10: ...ng Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum per...

Страница 11: ...e from supply and remove mechanical blockage Line voltage faulty Check line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning...

Страница 12: ...aintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing volta...

Страница 13: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: