ebm-papst K3G500-PB33-05 Скачать руководство пользователя страница 14

Operating instructions

K3G500-PB33-05

Translation of the original operating instructions

Fig. 4: Example showing vibration measurement. Positioning of the
sensors will vary depending on the device and the circumstances of
installation.

6.2 Cleaning

To ensure a long service life, the fans have to be regularly checked for
proper operation and degree of soiling. The frequency of the checks is to
be adapted to the occurrence of soiling.

DANGER
Risk of injury from rotating fan.

→ Only clean when not in motion. Do not disconnect the fan

from the power supply, just switch it off via the control input.
This will prevent start-up of the fan.

;

Dirt deposits on the motor housing could lead to overheating of the
motor.

;

Dirt on the impeller can cause vibration which would shorten the
service life of the fan.

;

Severe vibration could destroy the fan.

;

In such cases immediately switch off and clean the fan.

;

The preferred method of cleaning is dry cleaning, e.g. using
compressed air.

;

Use is never to be made of corrosive cleaning agents!

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not use a high-pressure cleaner to clean the device.# Do

not use any acid, alkali or solvent-based cleaning agents.

→ Do not use any pointed or sharp-edged objects for cleaning

;

Completely remove any cleaning agents used.

;

Immediately switch off and replace the device if severe corrosion is
apparent at load-bearing or rotating parts.

;

Repairs to load-bearing or rotating parts are not permissible!

;

Operate the fan for 2 hours at maximum speed to permit the
evaporation of any moisture which may have ingressed.

;

If cleaning does not eliminate vibration, the fan may have to be re-
balanced. In such cases please contact ebm-papst.

;

The fan is provided with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of at least
40,000 hours.

;

Please contact ebm-papst if bearing replacement is required after this
period.

;

Adapt the maintenance intervals to the dust pollution occurring.

6.3 Safety test

NOTE
High-voltage test

The integrated EMC filter contains Y capacitors. Therefore, the
trigger current is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you carry out the

high-voltage test required by law. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What has to
be tested?

How to test?

Frequency

Which
measure?

Check the
protective
casing against
accidental
contact for
damage and to
ensure that it is
intact

Visual inspection At least every

6 months

Repair or
replacement of
the device

Check the
device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
the device

Mounting the
connection lines

Visual inspection At least every

6 months

Fasten

Check the
insulation of the
wires for damage

Visual inspection At least every

6 months

Replace wires

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean impeller
or replace device

Tightness of
screwed cable
gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensate
discharge holes
for clogging, as
necessary

Visual inspection At least every

6 months

Open bore holes

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

Vibration test

Vibration tester,
acceleration or
deceleration
measurement

Recommended
every 6 months

Clean impeller
or replace device

Item no. 55164-5-9970 · ENG · Revision 202992 · Release 2019-04-01 · Page 14 / 15

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G500-PB33-05

Страница 1: ...ry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is install...

Страница 2: ...user NOTE Electrical or electromagnetic interferences after integrating the device in installations on the customer s side Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER...

Страница 3: ...at an ambient air pressure of 800 mbar to 1050 mbar Using the device in accordance with the permitted ambient temperature see chapter 3 6 Transport and storage conditions and chapter 3 2 Nominal data...

Страница 4: ...on bottom rotor on top on request 2 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Cable diameter min 9 mm max 16 mm tightening torque 6 0 9 Nm 4 Tightening torque 3 5 0 5 Nm 5 Inlet n...

Страница 5: ...mpeller combination in a standardised measurement configuration 3 4 Technical features Mass 50 4 kg Size 500 mm Motor size 150 Surface of rotor Coated in black Material of electronics housing Die cast...

Страница 6: ...sibility of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only connected to a connection point with...

Страница 7: ...ter enters at the cable end on the customers side and can damage the device Make sure that the cable end is connected in a dry environment Connect the device only to circuits that can be switched off...

Страница 8: ...protection Due to the locked rotor protection the start up current LRA is equal to or less than the nominal current FLA 4 3 Connection in terminal box 4 3 1 Preparing connection lines for the connect...

Страница 9: ...ip edge can be produced by fitting a cable tie directly in front of the cable gland for example 4 4 Factory settings Factory settings with which the device is pre set by ebm papst Control mode paramet...

Страница 10: ...common connection contact rating max 250 VAC 2 A AC1 min 10 mA KL 2 3 NC Status relay floating status contact break for failure KL 3 1 RSA Bus connection RS485 RSA MODBUS RTU SELV KL 3 2 RSB Bus conn...

Страница 11: ...depending on EEPROM setting normal inverse can be selected for the controller function of the integrated controller via the bus or the digital input Normal Pin open or applied voltage 5 50 VDC Invers...

Страница 12: ...When putting the fan into service determine the speed ranges with excessive vibration levels and also any resonance frequencies that may be present When regulating the speed pass through resonance ra...

Страница 13: ...f de energise and remove mechanical blockage Mains supply voltage faulty Check mains supply voltage restore power supply Important The error message resets automatically The device starts up again aut...

Страница 14: ...th maintenance free ball bearings The lifetime lubrication of the ball bearings is designed for a service life of at least 40 000 hours Please contact ebm papst if bearing replacement is required afte...

Страница 15: ...ts could drop off during disassembly This can result in fatal or serious injury and material damage Secure components before unfastening to stop them falling 6 4 3 Component disposal The products are...

Отзывы: