6.2 Cleaning

To ensure a long service life, check the fans regularly for proper
operation and soiling. The frequency of checking is to be adapted
accordingly depending on the degree of soiling.

DANGER
Risk of injury from rotating fan.

→ Only clean when not in motion. Do not disconnect the fan

from the power supply, just switch it off via the control input.
This will prevent start-up of the fan.

;

Dirt deposits on the motor housing can cause overheating of the motor.

;

Soiling of the impeller can cause vibration that will shorten the service
life of the fan.

;

Severe vibration can destroy the fan.

;

In such cases, switch off the fan immediately and clean it.

;

The preferred method of cleaning is dry cleaning, e.g. using
compressed air.

;

Do not use aggressive cleaning agents!

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a high-pressure cleaner.# Do

not use acid, alkali or solvent-based cleaning agents.

→ Do not use any pointed or sharp-edged objects for

cleaning.

;

Completely remove any cleaning agents used.

;

If severe corrosion is visible on load-bearing or rotating parts, switch
off the device immediately and replace it.

;

Repair of load-bearing or rotating parts is not permitted!

;

Operate the fan for 2 hours at maximum speed so that any water that
has ingressed can evaporate.

;

If cleaning does not eliminate vibrations, the fan may need to be
rebalanced. To have it rebalanced, contact ebm-papst.

;

The fan is equipped with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of 40,000
hours.

;

If bearing replacement is necessary after that period, contact ebm-
papst.

;

Adapt the maintenance intervals to the actual level of dust exposure.

6.3 Safety inspection

NOTE
High-voltage test

The integrated EMC filter has Y capacitors. The tripping current
is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you perform the

legally required high-voltage test. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean impeller
or replace device

Tightness of
cable gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

Vibration test

Vibration tester,
start-up or
deceleration
measurement

Recommended
every 6 months

Clean impeller
or replace device

6.4 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.

Item no. 56857-5-9970 · ENU · Change 260705 · Approved 2022-09-01 · Page 14 / 15

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G400-HB41-01

Страница 1: ...d technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety r...

Страница 2: ...have to be taken by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DAN...

Страница 3: ...stationary systems Performing all maintenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter...

Страница 4: ...r on top on request 2 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Cable diameter min 9 mm max 16 mm tightening torque 6 0 9 Nm 4 Tightening torque 3 5 0 5 Nm 5 Inlet ring with press...

Страница 5: ...aluation loses its validity the conformity must be confirmed again The product does not fall within the scope of Regulation EU 2019 1781 due to the exception specified in Article 2 2a motors completel...

Страница 6: ...er of the device to ensure if necessary after consultation with the network operator that this device is only connected to a connection point with a Ssc value that is greater than or equal to 120 time...

Страница 7: ...ble can damage the device Make sure the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requ...

Страница 8: ...multiple of the nominal value 4 2 6 Locked rotor protection Due to the locked rotor protection the starting current LRA is equal to or less than the nominal current FLA 4 3 Connection in terminal box...

Страница 9: ...ible a drip edge can be produced by fitting a cable tie directly in front of the cable gland for example 4 4 Factory settings Factory settings made for the device by ebm papst Mode parameter set 1 PWM...

Страница 10: ...on control interface side KL2 3 NC Status relay floating status contact option 1 break for failure option 2 break for error message for run monitor KL 3 1 RSA RS485 interface for MODBUS RSA SELV KL 3...

Страница 11: ...SELV KL 3 10 Ain1 U Analog input 1 set value 0 10 V Ri 100 k adjustable curve SELV KL 3 11 Aout Analog output 0 10 VDC max 5 mA output of current motor modulation level motor speed adjustable curve S...

Страница 12: ...ng Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum per...

Страница 13: ...e from supply and remove mechanical blockage Line voltage faulty Check line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning...

Страница 14: ...aintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing volta...

Страница 15: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: