ebm-papst K3G355-PH49-05 Скачать руководство пользователя страница 4

Operating instructions

K3G355-PI93-05

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All measures have the unit mm.

1

Installation position: Shaft horizontal (install the support struts only vertically as shown in the illustration!) or rotor on bottom; rotor on top on
request

2

Cable diameter min. 4 mm, max. 10 mm, tightening torque 4±0.6 Nm

3

Inlet nozzle with pressure tap (k-factor: 148)

4

Tightening torque 3.5±0.5 Nm

5

Mounting holes for FlowGrid

Item no. 54835-5-9970 · ENG · Revision 202174 · Release 2019-01-17 · Page 4 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G355-PH49-05

Страница 1: ...ry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is install...

Страница 2: ...user NOTE Electrical or electromagnetic interferences after integrating the device in installations on the customer s side Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER...

Страница 3: ...at an ambient air pressure of 800 mbar to 1050 mbar Using the device in accordance with the permitted ambient temperature see chapter 3 6 Transport and storage conditions and chapter 3 2 Nominal data...

Страница 4: ...n in the illustration or rotor on bottom rotor on top on request 2 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Inlet nozzle with pressure tap k factor 148 4 Tightening torque 3 5 0...

Страница 5: ...mpeller combination in a standardised measurement configuration 3 4 Technical features Mass 27 kg Size 355 mm Motor size 112 Surface of rotor Coated in black Material of electronics housing Die cast a...

Страница 6: ...vice is only connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND START UP 4 1 Connecting the mechanical sys...

Страница 7: ...e installation situation it may be necessary to connect an additional protective earth conductor by way of the extra protective earth terminal provided on the device The protective earth terminal is l...

Страница 8: ...t the lines to the corresponding terminals Use a screwdriver to do so During the connection work ensure that no cables splice off Fig 2 Connecting the wires to terminals Seal the terminal box 4 3 3 Ca...

Страница 9: ...instructions Control function parameter set 2 Positive heating Item no 54835 5 9970 ENG Revision 202174 Release 2019 01 17 Page 9 14 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone...

Страница 10: ...pin or applied voltage 5 50 VDC disabling bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 parameter set sw...

Страница 11: ...When putting the fan into service determine the speed ranges with excessive vibration levels and also any resonance frequencies that may be present When regulating the speed pass through resonance ra...

Страница 12: ...remove them afterwards Motor does not turn Mechanical blockage Switch off de energise and remove mechanical blockage Mains supply voltage faulty Check mains supply voltage restore power supply Importa...

Страница 13: ...at maximum speed to permit the evaporation of any water which has ingressed If cleaning does not eliminate vibration the fan may have to be re balanced In such cases please contact ebm papst The fan i...

Страница 14: ...ts could drop off during disassembly This can result in fatal or serious injury and material damage Secure components before unfastening to stop them falling 6 4 3 Component disposal The products are...

Отзывы: