Operating instructions

K3G355-BC92-02

Translation of the original operating instructions

Fig. 5: Example illustrating vibration measurement. The arrangement of
the sensors depends on the device concerned and the installation
situation.

6.2 Cleaning

To ensure a long service life, check the fans regularly for proper
operation and soiling. The frequency of checking is to be adapted
accordingly depending on the degree of soiling.

DANGER
Risk of injury from rotating fan.

→ Only clean when not in motion. Do not disconnect the fan

from the power supply, just switch it off via the control input.
This will prevent start-up of the fan.

;

Dirt deposits on the motor housing can cause overheating of the motor.

;

Soiling of the impeller can cause vibration that will shorten the service
life of the fan.

;

Severe vibration can destroy the fan.

;

In such cases, switch off the fan immediately and clean it.

;

The preferred method of cleaning is dry cleaning, e.g. using
compressed air.

;

Do not use aggressive cleaning agents!

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

cleaner.

→ Do not use any acid, alkali or solvent-basedcleaning

agents.

→ Do not use any pointed or sharp-edged objects for cleaning

;

Completely remove any cleaning agents used.

;

If severe corrosion is visible on load-bearing or rotating parts, switch
off the device immediately and replace it.

;

Repair of load-bearing or rotating parts is not permitted!

;

Operate the fan for 2 hours at maximum speed so that any water that
has ingressed can evaporate.

;

If cleaning does not eliminate vibrations, the fan may need to be
rebalanced. To have it rebalanced, contact ebm-papst.

;

The fan is equipped with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of 40,000
hours.

;

If bearing replacement is necessary after that period, contact ebm-
papst.

;

Adapt the maintenance intervals to the actual level of dust exposure.

6.3 Safety inspection

NOTE
High-voltage test

The integrated EMC filter has Y capacitors. The tripping current
is exceeded when AC testing voltage is applied.
→ Test the device with DC voltage when you perform the

legally required high-voltage test. The voltage to be used
corresponds to the peak value of the AC voltage required by
the standard.

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Impeller for
wear/deposits/
corrosion and
damage

Visual inspection At least every

6 months

Clean impeller
or replace device

Tightness of
cable gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

Vibration test

Vibration tester,
start-up or
deceleration
measurement

Recommended
every 6 months

Clean impeller
or replace device

6.4 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.

Item no. 52485-5-9970 · ENU · Change 212946 · Approved 2020-07-14 · Page 13 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G355-BC92-02

Страница 1: ...permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the devic...

Страница 2: ...ore working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and caus...

Страница 3: ...Chapter 3 2 Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited and c...

Страница 4: ...ertically as illustrated or rotor on bottom rotor on top on request 2 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Inlet ring with pressure tap k factor 148 4 Tightening torque 3 5 0...

Страница 5: ...ed using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 26 kg Size 355 mm Motor size 112 Rotor surface Painted black Electronics housing material Die...

Страница 6: ...n with the network operator that this device is only connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND ST...

Страница 7: ...ustomer end of the cable can damage the device Make sure the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnect...

Страница 8: ...multiple of the nominal value 4 2 6 Locked rotor protection Due to the locked rotor protection the starting current LRA is equal to or less than the nominal current FLA 4 3 Connection in terminal box...

Страница 9: ...e gland for example When routing the cable make sure that the cable glands are located at the bottom The cables must always be routed downward Fig 4 Cable routing for fans installed upright 4 4 Factor...

Страница 10: ...nics enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 Sw...

Страница 11: ...ng Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum per...

Страница 12: ...eck line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connec...

Страница 13: ...pt the maintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testi...

Страница 14: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: